W3P90-1572, Monthly Operating Rept for Nov 1990 for Waterford 3

From kanterella
(Redirected from W3P90-1572)
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1990 for Waterford 3
ML20065R615
Person / Time
Site: Waterford 
Issue date: 11/30/1990
From: Burski R, Killona L
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3P90-1572, NUDOCS 9012190106
Download: ML20065R615 (7)


Text

...

' gent:rgyj

.. L

,L e.,,, o,,,,.u.., io..

g fffCS -

. Operations

lll1;;[;gi Raymond F. Burski ww l f, Q s

't 1 ; hi^ t 1

W3P90-1572 A4.05 QA

' December 12, 1990 U.S. Nuclear Regulatory-Commission

.- ATTN:

Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. - NPF-38 Monthly Operating Report Gentlemen:

Enclosed is ' the subject monthly report which covers the operating statistics for the month of November,1990.

This report is submitted per Section 6.9.1.6.of the Waterford 3 Technical Specifications for Facility Operating-License No. NPF-38.

Very truly yours, l ns

~

RFB /LWL/ssf Enclosure ec:. Messrs. R.D. Martin, NRC Region IV D.L. Wigginton, NRC-NRR

- E. L. 'Blake -

-R.B.

McGehee J.T. Wheelock (INPO Records Center)

NRC Resident. Inspectors Office

'9012190106 901130 fbAf; PDR ADOCK 05000382 PDR

( I,'

p

~

I 4

b NRC t10NTHLY OPERATING REPORT SUrbiARY OF OPERATIONS WATERFORD 3 NOVEtll3ER 1990 i

The-unit operated at an average reactor power of 99.7% and experienced no shutdowns or significant power reductions during the period.

il W310204D

.. -. ~

~..-.

~..... -. -.. -... -.

~

.. ~. _. -.. --.

.s

-t PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 Dnring the month of November 1990, there were no pressurizer safety valve

failures or challenges.

e W310204B-

,r t

wewe-er er

  • rni e---'---d-+--

t--

e-a-.i~-.-

'-++-

we -- ** -,- - -

- * *+""

r.'+e-

OPERATING DATA REPORT ID'IT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA DATE: DECEMBER-1990,

OPERATING STATUS 1.' Docket: 50-382 Notes

2. Reporting Period:

NOVEMBER, 1990

3. Utility

Contact:

PATRICK CENT 0LANZI Phone Number:

(504) 739-6683

4. Licensed Thermal Power-(MWt): 3390

-5. Nameplate Rating (Gross Mwe): 1200

6. Design Electrical Rating (Net HWe): 1104
7. Maximum-Dependable Capacity (Gross MWe): 1120
8. Maximum Dependable Capacity (Net MWe): 1075
9. If-Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give' Reasons:

10.

Power' Level To Which Restricted, if Any (Net MWe):

NONE

11.. Reasons-For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative 12.

Hours In Reporting Period 720 8,016.0

-45,457.0-13.- Number of Hours Reactor Was Critical 720 7,387.0

-37,348.7 14.

Reactor Reserve Shutdown Hours 15- -Hours' Generator On-Line 720 7,337.3

-36,764.0 16.

Unit Reserve Shutdown Hours W310204B

OPERATING DATA REPORT l

(Continued)

This Month Yr.-Lo-Date Cu'nulative 17.

Gross Thermal Energy 2,433,754 24,406,169 120,112,694 Generated (MWil) 18.

Gross Electrical Energy

___812,600 8,168,590 40,408,790 Generated (MWil) 19.

Net Electrical Energy 779,878 7,802,083 38 472,371 2

Generated (MWil) 20.

Unit Service Factor 100.0 91.5 80.9 21.

Unit Availability Factor 100.0 91.5 80.9 22.

Unit. Capacity Factor 100.8 90.5 78.7 (Using MDC Net) 23.

Unit Capacity Factor 98.1 88.2 76.7 (Using DER Net) 24.

Unit Forced Ottage Rate 0

1.7 4.8 25.

Unit Forced Outage llours 0

124.1 1,859.5 26.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling 1 3/24/91, 60 Days 27.

If Shut Down At End of Report Period, Estimated Date Of Startup:

28.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 3/4/85 INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION 9/24/85-W310204B

,-... ~

,. ~.

-. - - = -..,

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO, 50-382 UNIT WATERFORD 3 DATE DECEtiBER 1990 C0FIPLETED BY PATRICK CENT 0LANZI-TELEP110NE 504-739-6683 110NTl! NOVEt!BER, 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (tNe-Net)

(tNe-Net) 1 1084 17 IJ54 2

1083 18 1087 3

1084 19 1085 4

1085 20 1084-5.

1086 21 1082 6

1086 22 1085 7

1085 23 1086 8.

1085

.24 1083 9

1083

-25 1086' 10 1083 26 1080 11 1086 27 1080 12-1085~

28

'1081 13 1085

-29 1083

-14 1085 30 1083 15' 1086 31 N/A 16-1086 INSTRUCTIONS-On this format, list. the average daily unit. power -level in FNe-Net for each day in the report.ing month.

Compute to the nearest whole megawatt.

W310204B J

r r--

9e y

e,+--

+

rme, m

4 UNIT Sh*CTDOWNS AND POVER REDCCTION3 REPORT FOR NOVEMBER 1990 DOCKET NO 50_-382 _

=

UNIT NAME WATERFORD 3 DATE DECEMEER 1990 COMPLETED BY PATRICK CENOLANII TELEPHONE 5ii4-739-6683 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to 5

No.

Date T,g (Ih)URS)

REASON Down Reactor Report #

Code

  • Code Prevent Recurrence 2

3 NONE I

1 2

3 F: Forced Reason:

Method S: Scheduled A-Equioment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.

C-Refuel ng 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation 4

E-Operator Training &

5-Load Reduction IEEE Std. 805-1964 License Examination 9-Other 5

IEEE Std. 803r-1983 F-Administrative G-Operational Error (Explain) l i

H-Other (Explain)

W310204B

.. j