  • ~ e..

t NRC HONTHLY OPERATING REPORT St& DIARY OF OPERATIONS WATERFORD 3 OCTOBER 1988 The unit operated at an average reactor power of 60.0% and experienced one (1) scheduled shutdown.

P 1

8811180033 081031 I PDR ADOCK 05000302 R PNV ZE Tl

///

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of October 1988, there were no pressurizer safety valve failures 01 challenges.

l t

' (i 3 :-

OPERATING DATA REPORT

?i -

  • i UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA DATE: NOVEMBER 1988 7

OPERATING STATUS

1. Docket: 50-382 Notes
2. Reporting Period: OCTOBER 1988
3. Utility

Contact:

PATRICK CENT 0LANZI Phone Number: (504) 464-3360 _

4

4. Licensed Thermal Power (MWL): 3390
5. Nameplate Rating (Gross Mwe): 1153
6. Design Electrical Rating (Net MWe): 1104
7. Maximum Dependable Capacity (Gross MWe): 1120 i

3

8. Maximum Dependable Capacity (Net MWe): 1075
9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
10. Power Level To Which Restricted, if Any (Net MWe): NONE
11. Reasons For Restrictions, If Any: N/A f

This Month Yr.-to-Date Cumulative 4

12. Ilours In Reporting Period 745.0 7320.0 27217.0
13. Number Of Hours Reactor Was Critical 525.5 5559.6 21664.2
14. Reactor Reserve Shutdown liours 15 llours Generator On-Line 525.3 5419.8 21234.2
16. Unit Reserve Shutdown Hours - _ - . - - - _ - _ _ , .

OPERATING DATA REPORT (Continued)

This Month Yr.-to-Date Cumulative

17. Cross Thermal Energy 1,509.724 17,227,694 68,688,666 Generated (MWH)
18. Gross Electrical Energy 506,510 5,757,880 23,138,690 Generated (hWH)
19. Net Electrical Energy 478,507 5,461,828 21,986.297 Generated (MWH)
20. Unit Service Factor 70.5 74.0 78.0
21. Unit Availability Factor 70.5 74.0 78.0
22. Unit Capacity Factor 59.7 69.4 75.1 (Using MDC Net)
23. Unit Capacity Factor 58.2 67.6 73.2 (Using DER Net)
24. Unit Forced Outage Rate 0.0 2.8 6.6
25. Unit Forced Outage Hours 0.0 157.2 1493.5
26. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each):
27. If Shut Down At End 3f Report Period, Estimated Date Of Startup: 11/9/88
28. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 3/4/85 INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION 9/24/85

o; e O AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-382 UNIT WATERFORD 3 ,

DATE NOVEMBER 1988 COMPLETED BY PATRICK CENT 0LANZI TELEPHONE 504-464-3360 MONTH OCTOBER 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 957 17 980 2 955 18 982 ,

3 956 19 980 4 956 20 840 5 960 21 681 6 946 22 -21 7 975 23 -14 8 983 24 -12 9 988 25 -13 10 979 26 -15 11 985 27 -15 12 982 28 -15 13 1020 29 -15 14 1021 30 -15 15 981 31 -17 16 982 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

'~

UNIT SHUTDOWNS AND PokT.R REDUCTIONS REPORT FDR OCTOBER 1988 .

DOCKET NO 50-382 UNIT NAME WA.TERFORD 3 DATE NOVEMBER 1988 COMPLETED EY PATRICK CENT 01ANZI TELEPHONE '04-464-3360 Method of Licensee Causc & C(rrective Duration Shutting Event System Component Action to No. Date Type l (if0URS) REASON 2 Down Reactor 3 Report # Codei Code 5 Prevent Recurrence 88-10 881021 S 219.7 B 1 N/A SJ V Unit removed from Ser-vice to allow correc-tion of a problem that was causing a noise in two (2) feedwater check valves.

Removed swing arms and hinge pins. Other internals removed during startup in 1982.

I 2 3 F: Forced Reason: Method S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maiatenance or Test 2-Manual Scram.

C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation 4 E-Operator Training & 5-Load Reduction IEEE Std. 805-1984 License Examination 9-Other 5 F-Administrative IEEE Std. 803A-1983 G-Operational Error (Explain)

H-Other (Explain)

  1. P p.o.Boxe0340 LO UISI AN A / sirNEW P O W E F1 & L 1 G H T BAnoNNe Srneer OnLEANS, LOUISIANA 70160 * (504)595 3100 NNEsM November 15, 1988 W3P88-1861 A4.05 QA U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 MONTHLY OPERATING REPORT Enclosed is the subject nonthly report which covers the operating statistics for the month of October 1988. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours.

./

/ -

'- 44_.64 5v.o g'

R.F. Burski Manager Nuclear Safety & Regulatory Affairs RFB:LWL:ssf Enclosure cc R.D. Martin, NRC Region IV NRC Resident Inspectorn Office J.A. Calvo, NRC-NRR D.L. Wigginton, NRC-NRR I INPO Records Center (J.T. Wheelock)

E.L. Blake W.M. Stevenson II "AN EQUAL Opp 0RTUNITY EMPLOYER"