W3P88-1262, Advises That Completion Date for Evaluation of Ventilation Sys Root Valve Documentation Rescheduled for 881130,per Insp Rept 50-382/88-08.Review More Time Consuming than Expected
| ML20151U602 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/09/1988 |
| From: | Burski R LOUISIANA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| W3P88-1262, NUDOCS 8808190188 | |
| Download: ML20151U602 (1) | |
Text
<.
]
LO UIB1 AN A / 317 BARONNE STREET P. O. BOX 60340 POWE R & LIGHT NEW ORLEANS, LOUIS!AN A 70160 (504) 595-3100
$uidbsYl0 August 9, 1988 W3P88-1262 A4.05 QA U.S. Nuclear Regulatory Counission ATTN Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 NRC Inspection Report 88-08, Updated Information
Reference:
LP&L letter W3P88-1234 dated 7/1/88 from R.F. Burski to U.S. Nuclear Regulatory Commission In the referenced letter Louisiana Power & Light stated that an evaluation of ventilation system root valve documentation and a review of non-ventilation ESF system drawings for root valve discrepancies would be completed by August 1, 1988. These two projects have proved to be more time consuming than originally expected. Therefore, the completion date for evaluation of ventilation system root valve documentation has been rescheduled for November 30, 1988 and the completion date for the review of non-ventilation ESF system drawings for root valve discrepancies has been rescheduled for August 12, 1988.
If there are any questions concerning this information, please contact L.W.
Laughlin, Site Licensing Support, at (504) 464-3499.
Very truly yours.
8808190183 880809 R*F* B"Y8ki PDR ADOCK 05000382 O
PDC Manager Nuclear Safety & Regulatory Affairs RFB:BGM:ssf Attachments cc:
R.D. Martin, NRC Region IV
{
J.A. Calvo, NRC-NRR l
D.L. Wigginton, NRC-NRR NRC Resident Inspectors Office E.L. Blake W.M. Stevenson Ip "AN EQUAL OPPORTONITY EMPLOYER"
~