,f NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 i
FEBRUARY 1988 The unit operated at approximately 100% power for the entire month.
I P
i i
b h
5 l
1 l
.l 1
c 6gY t
880316003/ GSO2RT AP PDR ADOCK 05000382 I/;
R DCD
i 5
L I
L PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES J
WATERFORD 3 1
During the month of February 1988, there were no pressurizer safety valve j
~ failures or challenges.
4 1
.I e
b N
1 t
i 1
I r
I 4
)
l 4
sr--~~~,,,-w,,ww
.. --wm
. ~ - - -
,,rw,-
~~
OPERATING DATA REPORT UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA DATE: MARCH 1988 OPERATING STATUS
- 1. Docket: 50-382 Notes
- 2. Reporting Period:
February 1988
- 3. Utility
Contact:
GEORGE MILLER Phone Number:
(504) 457-8211
- 4. Licensed Thermal Power (MWt): 3390
- 5. Nameplate Rating (Gross Mwe): 1153
- 6. Design Electrical Rating (Net MWe): 1104
- 7. Maximum Dependable Capacity (Gross MWe): 1120
- 8. Maximum Dependable Capacity (Net MWe): 1075
- 9. If Changes occur in Capacity Ratings (Items Number 4 Thrcagh 8) Since Last Report, Give Reasons:
10.
Power Level To Which Restricted, if Any (Net MWe):
NONE 11.
Reasons For Restrictions, If Any: N/A 9
This Month Yr.-to-Date cumulative 12.
Hours In Reporting Period 696.0 1440.0 21337.0__
13.
Number Of Hours Reactor Was Critical 696.0 1385.8 17490.4 14.
Reactor Reserve Shutdown Hours i 15 Hours Generator On-Line 696.0 1341.2 17155.6 16.
Unit Reserve Shutdown Hours i I
OPERATING DATA REPORT (Continued)
This Month Yr.-to-Date Cumulative 17.
Gross Thermal Energy 2,339,100 4,483,017 55,943,989 Generated (MWH) 18.
Gross Electrical Energy 795,510 1,518,830 18,899,640 Generated (MWH) 19.
Net Electrical Energy 763,683 1,453,691 17,978,160 Generated (MWH)
- 30. Unit Service Factor 100.0 93.1 80.4 21.
Unit Availability Factor 100.0 93.1 80.4 22.
Unit Capacity Factor 102.1 93.9 78.4 (Using MDC Net) 23.
Unit Capacity Factor 99.4 91.4 76.3 (Using DER Net) 24.
Unit Forced Outage Rate 0.0 4.0 7.5 25.
Unit Forced Outage Hours 0.0 55.6 1391.9 26.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling / Maintenance Outage, 4/2/88, 60 days 27.
If Shut Down At End of Report Period, Estimated Date Of Startup:
28.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 3/4/85 INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION 9/24/85 1
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-382 UNIT WATERFORD 3 DATE MARCH 1988 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 MONTH FEBRUARY 1988 i
DAl AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1104 17 1103 2
1102 18 1103 3
1103 19 1102 4
1103 20 1102 5
1103 21 1103 6
1103 22 1103 7
1102 23 1105 8
1104 24 1103 9
1102 25 1104 10 1103 26 1104 11 1104 27 1104 12 1104 28 1102 13 1045 29 1102 14 1075 30 15 1022 31 16 1102 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt,
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT FOR FEBRUARY 1988
~
DOCKET NO 50-382 UNIT NAME WATERFORD 3 DATE MARCH 1988 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date Type (HOURS)
REASON 2 Down Reactor 3 l
Code 5 Prevent Recurrence Report #
Codei NONE 1
2 3
F: Forced Reason:
Method S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Continuation 4
E-Operator Training &
5-Load Reduction IEEE Std. 805-1984 l
License Examination 9-Other 5
F-Administrative IEEE Std. 803A-1983 i
G-Operational Error (Explain) l H-Other (Explain) i
s
.~
LO U1SI AN A / 317 BARONNE STREET P. O. BOX 60340 (504) 595 3100 POWE A & LIGHT NEW ORLEANS, LOUISlAN A 70160 UtiON EsN March 9, 1988 W3P88-0044 A4.05 QA U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. hTF-38 MON 1HLY OPERATING REPORT Enclosed is the subject monthly report which covers the operating statistics for the month of February 1988. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Ope ra t it. - License No. N1F-38.
Very truly yours.
R.F. Burski Nuclear Safety & Regulatory Affairs Acting Manager RFB:GEW:ssf Enclosure cc:
R.D. Martin, NRC Region IV NRC Resident Inspectors Office J.A. Calvo, NRC-NRR D.L. Wigginton, NRC-NRR INP0 Records Center (J.T. Wheelock)
E.L. Blake W.M. Stevenson
- </
"AN EQUAL OPPORTUNITY EMPLOYER"
//