W3P87-2236, Monthly Operating Rept for Nov 1987

From kanterella
(Redirected from W3P87-2236)
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1987
ML20237D472
Person / Time
Site: Waterford 
Issue date: 11/30/1987
From: Cook K, Geoffrey Miller
LOUISIANA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
W3P87-2236, NUDOCS 8712230288
Download: ML20237D472 (7)


Text

.

.9 j'*

a NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 NOVEMBER 1987 l

The unit operated at approximately 100% power for the entire month.

I hfR g2 q

D e

t ____-

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 1

- During the month of November 1987, there were no pressurizer safety valve

' failures or challenges.

'7 0PERATINd DATA REPORT-UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA DATE: DECEMBER 1987 OPERATING STATUS

1. Docket: 50-382 Notes
2. Reporting Period: November 1987

-3.

Utility

Contact:

GEORGE MILLER Phone Number:

(504) 467-8211

4. Licensed Thermal Power (MWt): 3390
5. Nameplate Rating (Gross Mwe): 1153
6. Design Electrical Rating (Net MWe): 1104
7. Maximum Dependable Capacity (Gross MWe): 1120
8. Maximum Dependable Capacity (Net MWe): 1075
9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:

10.

Power Level To Which Restricted, if Any (Net MWe):

NONE 11.

Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative 12.

Hours In Reporting Period 720.0 8016.0 19153.0 13.

Number Of Hours Reactor Was Critical 720.0 6541.6 15421.9 14.

Reactor Reserve Shutdown Hours 15 Hours Generator On-Line 720.0 6411.2 15137.8 16.

Unit Reserve Shutdown Hours -__________-_Y

OPERATING DATA REPORT (Continued)

This Month Yr.-to-Date Cumulative 17.

Gross Thermal Energy 2,418,833 20,872,420 49,236,183 Generated (MWH) 18.

Gross Electrical Energy 824,300 7,055,960 16,624,960 Generated (MWH) 19.

Net Electrical Energy 791,044 6,703,946 15,802,705 Generated (MWH) 20.

Unit Service Factor 100.0 80.0 79.0 21.

Unit Availability Factor 100.0 80.0 79.0 22.

Unit Capacity Factor 102.2 77.8 76.8 (Using MDC Net) 23.

Unit Capacity Factor 99.5 75.8 74.7 (Using DER Net) 24.

Unit Forced Outage Rate 0.0 9.7 7.9 25.

Unit Forced Outage Hours 0.0 684.8 1294.8 26.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling / Maintenance Outage, 4/2/88, 60 days 27.

If Shut Down At End of Report Period, Estimated Date Of Startup:

28.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 3/4/85 INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION 9/24/85

s~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-382 UNIT WATERFORD 3 DATE DECEMBER 1987 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 MONTH NOVEMBER 1987 l'

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1099 17 1109 2

1100 18 1109 3

1100 19 1108 4

1065 20 1107 5

10^8 21 1107' 6

1100 22 1106 7

1101

23 1106 8

1101 24 1107 9

1088 25 1106 10 1074 26 1105 11 1105 27 1107 12 1107 28 1095 13 1107 29 1052 14 1109 30 1075 15 1109 31 16 1109 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

8E1 eor 39L1 rt u 1 L2 r

c D

I 8 one RRM -

C oR OE 7

i 2FBE6

&tt 3

8RMG4 cn 4

8 3EER -

eA e 8

9

- TCO4 s

v 9

1 0AEE0 u

e 1

5WDG5 a

r A

C P

5 3

0 0

8 8

YB t

n d

d OE DE eS t

t NM EN ne S

S A

TO od TN EH po E

E E

LP mC E

E KTEPE o

E E

CI TML C

4I 5I ONAOE DUDCT m

e4 m

t e a

n S

sd

.r o

N yo mcni O

SC aS ot I

r i c T

cct u C

Si ad U7 t ue D8 e

ll anR E9 et a ami r

R1 s nt d uuotd e ner onnt nah RR evo h a a uoot EE cE p tMMACLO WB i

e e - - - - - -

OM L

R 3M1 23459 PEV DO NN A

3 R

r SO f

o NF ogt W

nc OT di a DR ot e

)

TO htR n

UP t u i

HE eh n a

SR MS w l

o p

n T

D x

o I

E i

N

( t t& n U

s c

o ee i gi 2

rT rnt N

u ti a O

l r s nner S

i o eiivEi A

a F ami E

F e ratll R

c yTxa ap t ngr E rn na nor t

enit oesi(

n mel at sit o) pt el annar i S ninuureire t R ouif gecmeh aU s qa e e pi d pt rO aEMRROLAOO uH e - - - - -

2RABCDE FG D(

l e

py T

d e

e l

t d u a

ed D

c e rh oc FS E

N o

O N

N 1 FS

maa LO UISI AN A / 317 BARONNE STREET P. O. BOX 60340

+

(504)595-3100 POWER & L1GHT NEW ORLEANS, LOUISIANA 70160

$?00 EMS December 14, 1987 W3P87-2236 A4.05 QA U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. hTF-38 MONTHLY OPERATING REPORT Enclosed is the subject monthly report which covers the operating statistics for the month of November 1987. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours.

K.W. Cook l

Nuclear Safety and Regulatory Affairs Manager KWC:GEW:ssf Enclosure l

l cc:

R.D. Martin, NRC Region IV l

NRC Resident Inspectors Office j

J.A. Calvo, NRC-NRR J.H. Wilson, NRC-NRR INPO Records Center (J.T. Wheelock)

E.L. Blake W.M. Stevenson J

?

ha l

AN EQUAL OPPORTUNITY EMPLOYER"

\\

)