NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 FEBRUARY 1987 The unit started the month in a refueling / maintenance outage. On February 4 at 1019 the reactor was critical and on February 7 at 2245 the generator was synchronized to the grid. On February 8 at 0927 the turbine was tripped to prepare for the turbine overspeed test. On February 8 at 1837 the generator was back on line. Power ascension continued and the unit reached 100% power on February 21.

The unit continued operation at approximately 100% power for the remainder of the month, i

%f2ggjI Eshpff

,/ p 1

\\\\

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month"of February 1987, there were no pressurizer safety valve failures or challenges.

OPERATING DATA REPORT UNIT NAME: WATERF0FJ) 3 CITY / STATE: KILLONA/LA DATE: MARCH 1987 OPERATING STATUS

1. Docket: 50-382 Notes
2. Reporting Period: FEBRUARY 1987
3. Utility

Contact:

GEORGE MILLER Phone Number:

(504) 467-8211

4. Licensed Thermal Power (MWt): 3390
5. Nameplate Rating (Gross Hwe): 1153
6. Design Electrical Rating (Net MWe): 1104
7. Maximum Dependable Capacity (Gross MWe): 1120
8. Maximum Dependable Capacity (Net MWe): 1075
9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:

10.

Power Level To Which Restricted, if Any (Net MWe):

NONE 11.

Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative

12. Hours In Reporting Period 672.0 1416.0 12553.0 13.

Number of Hours Reactor Was Critical 589.7 589.7 589.7 14.

Reactor Reserve Shutdown Hours 15 Hours Generator On-Line 496.0 496.0 9222.6 16.

Unit Reserve Shutdcwn Hours l

OPERATING DATA REPORT (Continued)

This Month Yr.-to-Date Cumulative 17.

Gross Thermal Energy 1,379,459 1,379,459 29.743,222 Generated (HWH) 18.

Gross Electrical Energy 460,630 460,630 10,029,630 Generated (HWH) 19.

Net Electrical Energy 429,780 421,407 9,511,793 Generated (HWH)

20. Unit Service Factor 73.8 35.0 73.5 21.

Unit Availability Factor 73.8 35.0 73.5

22. Unit Capacity Factor 59.5 27.7 70.5 (Using MDC Net)
23. Unit Capacity Factor 57.9 27.0 68.6 (Using DER Net) 24.

Unit Forced Outage Rate 0.0 0.0 7.9

25. Unit Forced Outage Hours 0.0 0.0 787.2
26. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):

27.

If Shut Down At End of Report Period, Estimated Date Of Startup:

28.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 3/4/85 INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION 9/24/85

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-382 UNIT WATERFORD 3 DATE MARCH 1987 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 MONTH FEBRUARY 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

-24 17 898 2

-38 18 900 3

-39 19 895 4

-39 20 891 5

-39 21 1059 6

-39 22 901 7

-37 23 1076 8

53 24 1098 9

386 25 1097 10 722 26 1101 11 736 27 1101 12 728 28 1095 13 736 29 14 880 30 15 907 31 16 907 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS 4

l REPORT FOR FEBRUARY 1987

~

~.

I i

DOCKET NO 50-382 l

UNIT NAME WATERFORD 3 DATE MARCH 1987 3p COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to I

l Ns.

Date Type (HOURS)

REASON 2 Down Reactor 3 Prevent Recurrence Report #

Code 4 Code 5 i

86-18 861126 S

166.8 C,B 4

N/A N/A-N/A Refueling /Maintertance outage.

i Total = 1751.8 i

87-01 870208 S

9.2 B

N/A N/A TA TRB Turbine /ge.s.erator overspeed test.

i I

i l

L r

L 1

2 3

F: Forced Reason:

Method i

S: Scheduled A-Equipment Failure (Explain) 1-Manual i

B-Maintenance or Test 2-Manual Scram.

t C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation 4

i E-Operator Training &

5-Load Reduction IEEE Std. 805-1984 L

License Examination 9-Other 5

F-Administrative IEEE Std. 803A-1983 G-Operational Error (Explain)

~

H-Other (Explain)

1

~

LOUISI ANA / 317 BARONNESTREET P. O. BOX 60340 POWE A & L1GHT NEW ORLEANS, LOUISIANA 70160 (504) 595-3100 UNO$s?NU March 16, 1987 W3P87-0590 A4.05 QA U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 MONTHLY OPERATING REPORT Enclosed is the subject monthly report which covers the operating statistics for the month of February 1987. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours, E

alA ffs K.W. Cook Nuclear Safety and Regulatory Affairs Manager KWC GEW ssf Enclosure cc R.D. Martin, NRC Region IV NRC Resident Inspectoru Office G.W. Knighton, NRC-NRR J.H. W11non, NRC-NRR INPO Records Center (J.T. Wheelock) g((

E.L. Blakn W.M. Stevenson

/ tM)k 3-

"AN EO8JAL OPPORTUNITY EMPLO rdR"

-