c NRC MONTHLY OPERATING REPORT-

SUMMARY

OF OPERATIONS WATERFORD 3 DECEMBER 1986 The unit remained in a refueling / maintenance outage for the entire month.

8701200428 861231 4>l\\(\\\\

PDR ADOCK 05000382 PDR-R

PRESSURIZER SAFETY VALVE

' FAILURES AND CHALLENGES WATERFORD 3 During the month of December 1986, there were no pressurizer safety valve failures or challenges.

OPERATING DATA REPORT UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA DATE: JANUARY 1987' OPERATING STATUS

1. Docket: 50-332 3

Notes

2. Reporting Period: DECEMBER 1986
3. Utility

Contact:

GEORGE MILLER Phone Number:

(504) 467-8211

4. Licensed Thermal Power (MWt): 3390
5. Nameplate Rating (Gross Mwe): 1153
6. Design Electrical Rating (Net MWe): 1104
7. Maximum Dependable Capacity (Gross MWe): 1120
8. Maximum Dependable Capacity (Net MWe): 1075
9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:

10.

Power Level To Which Restricted, if Any (Net MWe):

NONE 11.

Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative 12.

Hours In Reporting Period 744.0 8760.0 11137.0 13.

Number Of Hours Reactor Was Critical 0.0 7011.6 8880.3

14. Reactor Reserve Shutdown Hours 15 Hours Generator On-Line 0.0 6919.6 8726.6 16.

Unit Reserve Shutdown Hours OPERATING DATA REPORT (Continued)

J-1 This Month Yr.-to-Date Cumulative

.17.

Gross Thermal Energy 0.0 22,721,324 28,363,763 Generated (MWH)

-18.

Cross Electrical Energy 0.0 7,671,150 9,569,000 Generated (MWH)

'19.. Net Electrical Energy

-6,786 7,301,595 9,098,759 Generated (MWH)

20. Unit Service Factor 0.0 79.0 78.4

- 21. Unit Availability Factor 0.0 79.0 78.4 2 2..

Unit Capacity Factor 0.0 77.5 76.0 (Usinr,MDC Net) 23.

Unit Capacity Factor 0.0 75.5 74.0 (I' sing DER Net)

24. Unit Forced Outage Rate 0.0 3.1 8.3
25.. Unit Forced Outage Hours 0.0 222.4 787.2 26.

Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Continue Refueling / Maintenance Outage in January 1987 and no other scheduled outage for the next 6 months.

27.

If Shut Down At End of Report Period, Estimated Date Of Startup:

01/30/87 28.

Units In Test Status (Prior to Commercial Operation):

3 Forecast Achieved INITIAL CRITICALITY 3/4/85 INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION 9/24/85

.-_m

~,.--...w_

3-.,,

-y-y

.---,-m,

-r

AVERAGE DAILY UNIT POWER LEVEL i

DOCKET NO. 50-382 UNIT WATERFORD 3 DATE JANUARY 1987 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 MONTH DECEMBER 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

-7 17

-10 2

-5 18

-11 3

-9 19

-11 4-

-10 20

-10 5

-6 21

-8 6

-10 22

-11 7

-10 23

-11 8

-10 24

-11 9

-10 25

-11 l'0

-10 26

-7 11

-10 27

-5 12

-10 28

-5 13

-10 29

-6 14

-10 30

-5 15

-11 31

-5 16

-11 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS.

REPORT FOR DECEMBER 1986 DOCKET NO 50-382 UNIT NAME WATERFORD 3 DATE JANUARY 1987 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 Method of Licensee Cause & Corrective-Duration Shutting Event System Component Action to l

No.

Date Type (HOURS)

REASON 2 Down Reactor 3 Report #

Code 4

. Code 5 Prevent Recurrence 86-18 861126 S

744.0 C,B 4

N/A N/A N/A Refueling / Maintenance outage.

Total = 841.0 1

2 3

F: Forced Reason:

Method S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.

C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation 4

E-Operator Training &

5-Load' Reduction IEEE Std. 805-1984 License Examination 9-Other 5

F-Administrative IEEE Std. 803A-1983 G-Operational Error (Explain)

H-Other (Explain) 9

i r

I LOUISI AN A / 317 BARONNESTREET

+

P. O. BOX 60340 POWER & L1GHT NEW ORLEANS, LOUISTANA 70160 (504)595 3100

+

$i!Sks hrSNM January 15, 1987 W3P87-0508 A4.05 QA U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 MONTHLY OPERATING REPORT Enclosed is the subject monthly report which covers the operating statistics for the month of December 1986. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours, V

K.W. Cook Nuclear Safety and Regulatory Affairs Manager KWC:GEW:ssf Enclosure cc:

R.D. Martin, NRC Region IV NRC Resident Inspectors Office G.W. Knighton, NRC-NRR J.H. Wilson, NRC-NRR INPO Records Center (J.T. Wheelock)

E.L. Blake W.M. Stevenson lfIfE&

"AN EQUAL OPPORTUNITY EMPLOYER"

.--