Sheet 1 of 1 NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 FEBRUARY 1986 The unit started the month at 100% power and operated at approximately 100%
power until February 28.
On February 28 a power reduction was initiated to perform control element assembly exercising and turbine valve testing required l
by technical specifications. The unit ended the month at approximately 50%
power.
1 l
l l
l l
1 l
l
$$$33Socko%8o ga R
i I.E l'1 a
r-PRESSURIZER SAFETY VALVE FAILURES AND CllALLENGES WATERFORD 3 During the month of February 1986, there were no pressurizer safety valve failures or challenges.
e k.
OPERATING DATA REPORT UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA DATE: MARCll 1986 OPERATING STATUS 1
- 1. Docket: 50-382 Notes (1) Maximum Dependable
- 2. Reporting Period: FEBRUARY 1986 Capacity (Gross and Net MWe) will be
- 3. Utility
Contact:
. GEORGE MILLFD,
[m affr e
I Phone Number:
(504) 467-8211
- 4. Licensed Thermal Powar (MWt): 3390
- 5. Nameplate Rating (Gross Mwe): 1153
- 6. Design Electrical Rating (Net MWe): 1104 f
- 7. Maximum Dependable Capacity (Gross MWe): (Note 1) l
- 8. Maximum Dependable Capacity (Net MWe): (Note 1)
- 9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
N/A l
j 10.
Power Level To Which Restrl-ted, if Any (Net MWe):
NONE 11.
Reasons For Restrictions, If Any: N/A l
This Month Yr.-to-Date Cumulative t
12.
Ilours In Reporting Period 672.0 1416.0 3793.0 13.
Number Of Ilours Reactor Was Critical 672.0 1377.4 __
3246.1 14.
Reactor Reserve Shutdown flours 15 Hours Generator On-Line 672.0 1365.9 3167.7 16.
Unit Reserve Shutdown Hours ___ 1
OPERATING DATA REPORT (Continued)
This Month Yr.-to-Date Cumulative 17.
Gross Thermal Energy Generated (MWII) 2,236,098 4,549,244 10,191,683 18.
Gross Electrical Energy Generated (MWii) 754,780 1,535,370 3,433,220 19.
Net Electrical Energy Generated (MWH) 721,047 1,465,343 3,270,496 20.
Unit Service Factor 100.0 96.5 83.5 21.
Unit Availability Factor 100.0 96.5 83.5 22.
Unit Capacity Factor (Using MDC Net)
(NOTE 1)
(NOTE 1)
(NOTE 1) 23.
Unit Capacity Factor (Using DER Net) 97.2 93.7 78.1 24.
Unit Forced Outage Rate 0.0 3.5 16.3 25.
Unit Forced Outage llours 0.0 50.1 614.9 26.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Unit shutdown scheduled in March 1986 to perform Technical Specification surveillances requiring a__ unit shutdown, duration: approximately 16 days.
27.
If Shut Down At End of Report Period, Estimated Date Of Startup:
28.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 3/4/85 INITIAL ELECTRICITY
- 3/18/85 COMMERCIAL OPERATION 9/24/85 t
,t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-382 UNIT WATERFORD 3 DATE MARCl! 1986 COMPLETED BY GEORGE MILLER TELEPliONE 504-467-8211 MONTil FEBRUARY 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NWe-Net)
(MWe-Net) 1 1092 17 1089 2
1091 18 1089 3
1093 19 1089 4
1094 20 1089 5
1092 21 1086 6
1092 22 1090 7
1086 23 1089 1
8 1095 24 1093 9
1015 25 1089 I
10 1002 26 1089 11 1090 27 1091 12 1086 28 779 13 1088 29 14 1091 30 15 1088 31 16 1089 1
INSTRUCTIONS On this focmat, list the average daily unit power level in HWe-Net for each day in the repo:-ting month. Compute to the nearent whole megawatt.
(9/77)
_ - - _ _ -._. = - - -..
UNIT SHUTDOWNS AND POWER REDUCTIONS
- l l
REPORT FOR FEBRUARY 1986 DOCKET NO 50-382 UNIT NAME WATERFORD 3 DATE MARCH 1986 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 l
Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to l
2 No.
Date Type (HOURS)
REASON,
Down Reactor 3 Report #
Codei Code 5 Prevent Recurrence 86-03 86022S S
0.0 B
5 N/A AA,TA ZZZZ Unit Power reduc-tion was initiated to perform control element assembly exercising and turbine valve testing required l
by technical specifications.
l l
1 2
3 F: Forced Reason:
Method l
l S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Continuation 4
E-Operator Training &
5-Load Reduction IEEE Std. 805-1984 License Examination 9-Other 5
F-Administrative IEEE Std. 803A-1983 G-Operational Error (Explain)
H-Other (Explain)
,e' e.-
P O W E R G L IG H T7 P o cox mon. Ntw ostrANS. ACUSANA 70114 34a ott nonot surr
- %L '160 /345 UiluilES SYSTEM March 14, 1986 W3P86-6051 A4.05 QA Mr. Ronald M. Scroggins Controller and Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. FPF-38 MONTHLY OPERATING REPORT
Dear Mr. Scroggins:
Enclosed is the subject monthly report which covers the operating statistics for the month of February 1986. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications fer Facility Operating License No. NPF-38 Very truly yours, l
C K.W. Co4 NucJear Support 6 Licensing Manager KWC:CEW:ssf Enclosure cc:
R.D. Martin, NRC Region IV NRC, Director, Office o' IAE G.W. Knighton, NRC-NRR NRC Resident inspectors Office INPO Records Center (J.T. Wheelock) f*f B.W. Churchill
]
)