Sheet 1 of 1 NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 AUGUST 1985 The unit remained shut down for the entire month to repair turbine generator i
damage.
'k
'I 0
i i
4 1
I
?
1 8509170347 850831 PDR ADOCK 05000382 Spf R
SPRING-LOADED PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 4
During the month of August 1985, there were no spring-loaded pressurizer safety valve failures or challenges.
4 i
4 4
I.
i t
i J
f f
i 4
e i
r e
I i
l 3
.~w-sm,,
y-e v.rw.
y
, m,
n
-me,wc-r v--
e -+.,.
v~----ye--
OPERATING DATA REPORT UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA DATE: SEPTEMBER 1985 OPERATING STATUS
- 1. Docket: 50-382 Notes (1) Maximum Dependable
- 2. Reporting Period: AUGUST 1985 Capacity (Gross and Net MWe) will be
- 3. Utility
Contact:
GEORGE MILLER 0
wr at ra Phone Number:
(504) 467-8211
- 4. Licensed Thermal Power (MWt): 3390
- 5. Nameplate Rating (Gross Mwe): 1153 i
- 6. Design Electrical Rating (Net MWe): 1104
- 7. Maximum Dependable Capacity (Gross MWe): (Note 1) l
- 8. Maximum Dependable Capacity (Net MWe): (Note 1)
- 9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
N/A i
10.
Power Level To Which Restricted, if Any (Net MWe):
NONE 11.
Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative 12.
Hours In Reporting Period 744.0 3985.1 3985.1 13.
Number Of Hours Reactor Was Critical 1474.3 1474.3 14.
Reactor Reserve Shutdown Hours 15 Hours Generator On-Line 1285.2 1285.2 16.
Unit Reserve Shutdown Hours.
OPERATING DATA REPORT (Continued)
This Month Yr.-to-Date Cumulative 17.
Gross Thermal Energy -
Generated (MWH) 2,510,810 2,510,810
-18.
Gross Electrical Energy Generated (MWH) 764,670 764,670 19.
Net Electrical Energy Generated (MWH) 705,198 705,198 20.
Unit Service Factor N/A N/A N/A 21.
Unit Availability Factor N/A N/A N/A 22.
Unit Capacity Factor (Using MDC Net)
N/A N/A N/A 23.
Unit Capacity Factor (Using DER Net)
N/A N/A N/A 24.
Unit Forced Outage Rate 100.0 67.2 67.2 25.
Unit Forced Outage Hours 744.0 2627.4 2627.4 26.
Shutdowns Scheduled'Over Next 6 Months (Type, Date, and Duration of Each):
N/A 27.
If Shut Down At End of Report Period, Estimated Date Of-Startup:
September 27, 1985 28.
Units In-Tect Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 3/4/85 INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION
,9/85 t
l.
L
l l
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-382 UNIT WATERFORD 3 DATE SEPTEMBER 1985 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 MONTH AUGUST 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 17 2 18 3 19 4 20 5 21 6 22 7 23 8 24 9 25 10 26 11 27 12 28 13 29 14 30 15 31 16 f INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
F
v UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT FOR AUGUST 1985 DOCKET NO 50-382 UNIT NAME WATERFORD 3 DATE SEPTEMBER 1985 COMPLETED BY GEORGE MILLER 4
TELEPHONE 504-467-8211 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to Na.
Date Type (HOURS)
-REASON 2 Down Reactor 3 l
Code 5 Report #
Codei Prevent Recurrence 85-018 850718 F 744.0 A
1 N/A TA TRB At 25% power, the Total hours: 1076.0 turbine was manually tripped when turbine vibration was discovered.
Unit was manually shut down to repair turbine generator damage.
I 2
3 F: Forced Reason:
Method S: Scheduled
.A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Continuation 4
E-Operator Training &
5-Load Reduction IEEE Std. 805-1984 License Examination 9-Other 5
F-Administrative IEEE Std. 803A-1983 G-Operational Error (Explain)
H-Other (Explain)
L
LOUISIANA 342 ouinoNoe s1nEer POWER & L1GHT P O Box 6008. NEW OnLEANS. LOUISIANA 70174 * (504) 366 2345 NEddv5SE September 9, 1985 W3P85-1474 A4.05 N
/ ",
Mr. Ronald M. Scroggins Y
Controller and Director Office of Resource Management
//
RECEIVED A
U.S. Nuclear Regulatory Commission SEP13198E>
Washington, D.C. 20555
Dear Mr. Scroggins:
ro 6
CD 4
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 MONTHLY OPERATING REPORT Enclosed is the subject monthly report which covers the operating statistics for the month of August 1985. This report is submitted per Section 6.9.1.6 of t'he Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, K.W. Cook Nuclear Support & Licensing Manager KWC:GEW:sms Enclocure cc:
R.D. Martin, NRC Region IV NRC, Director, Office of I&E G.W. Knighton, NRC-NRR NRC Resident Inspectors Office INPO Records Center (J.T. Wheelock)
B.W. Churchill W.M. Stevenson 6