W3P85-1474, Monthly Operating Rept for Aug 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1985
ML20135F663
Person / Time
Site: Waterford 
Issue date: 08/31/1985
From: Cook K, Geoffrey Miller
LOUISIANA POWER & LIGHT CO.
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
W3P85-1474, NUDOCS 8509170347
Download: ML20135F663 (7)


Text

-

. ~

Sheet 1 of 1 NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 AUGUST 1985 The unit remained shut down for the entire month to repair turbine generator i

damage.

'k

'I 0

i i

4 1

I

?

1 8509170347 850831 PDR ADOCK 05000382 Spf R

PDR

SPRING-LOADED PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 4

During the month of August 1985, there were no spring-loaded pressurizer safety valve failures or challenges.

4 i

4 4

I.

i t

i J

f f

i 4

e i

r e

I i

l 3

.~w-sm,,

y-e v.rw.

y

, m,

n

-me,wc-r v--

e -+.,.

v~----ye--

OPERATING DATA REPORT UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA DATE: SEPTEMBER 1985 OPERATING STATUS

1. Docket: 50-382 Notes (1) Maximum Dependable
2. Reporting Period: AUGUST 1985 Capacity (Gross and Net MWe) will be
3. Utility

Contact:

GEORGE MILLER 0

wr at ra Phone Number:

(504) 467-8211

4. Licensed Thermal Power (MWt): 3390
5. Nameplate Rating (Gross Mwe): 1153 i
6. Design Electrical Rating (Net MWe): 1104
7. Maximum Dependable Capacity (Gross MWe): (Note 1) l
8. Maximum Dependable Capacity (Net MWe): (Note 1)
9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:

N/A i

10.

Power Level To Which Restricted, if Any (Net MWe):

NONE 11.

Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative 12.

Hours In Reporting Period 744.0 3985.1 3985.1 13.

Number Of Hours Reactor Was Critical 1474.3 1474.3 14.

Reactor Reserve Shutdown Hours 15 Hours Generator On-Line 1285.2 1285.2 16.

Unit Reserve Shutdown Hours.

OPERATING DATA REPORT (Continued)

This Month Yr.-to-Date Cumulative 17.

Gross Thermal Energy -

Generated (MWH) 2,510,810 2,510,810

-18.

Gross Electrical Energy Generated (MWH) 764,670 764,670 19.

Net Electrical Energy Generated (MWH) 705,198 705,198 20.

Unit Service Factor N/A N/A N/A 21.

Unit Availability Factor N/A N/A N/A 22.

Unit Capacity Factor (Using MDC Net)

N/A N/A N/A 23.

Unit Capacity Factor (Using DER Net)

N/A N/A N/A 24.

Unit Forced Outage Rate 100.0 67.2 67.2 25.

Unit Forced Outage Hours 744.0 2627.4 2627.4 26.

Shutdowns Scheduled'Over Next 6 Months (Type, Date, and Duration of Each):

N/A 27.

If Shut Down At End of Report Period, Estimated Date Of-Startup:

September 27, 1985 28.

Units In-Tect Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 3/4/85 INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION

,9/85 t

l.

L

l l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-382 UNIT WATERFORD 3 DATE SEPTEMBER 1985 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 MONTH AUGUST 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 17 2 18 3 19 4 20 5 21 6 22 7 23 8 24 9 25 10 26 11 27 12 28 13 29 14 30 15 31 16 f INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

F

v UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT FOR AUGUST 1985 DOCKET NO 50-382 UNIT NAME WATERFORD 3 DATE SEPTEMBER 1985 COMPLETED BY GEORGE MILLER 4

TELEPHONE 504-467-8211 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to Na.

Date Type (HOURS)

-REASON 2 Down Reactor 3 l

Code 5 Report #

Codei Prevent Recurrence 85-018 850718 F 744.0 A

1 N/A TA TRB At 25% power, the Total hours: 1076.0 turbine was manually tripped when turbine vibration was discovered.

Unit was manually shut down to repair turbine generator damage.

I 2

3 F: Forced Reason:

Method S: Scheduled

.A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.

C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation 4

E-Operator Training &

5-Load Reduction IEEE Std. 805-1984 License Examination 9-Other 5

F-Administrative IEEE Std. 803A-1983 G-Operational Error (Explain)

H-Other (Explain)

L

LOUISIANA 342 ouinoNoe s1nEer POWER & L1GHT P O Box 6008. NEW OnLEANS. LOUISIANA 70174 * (504) 366 2345 NEddv5SE September 9, 1985 W3P85-1474 A4.05 N

/ ",

Mr. Ronald M. Scroggins Y

Controller and Director Office of Resource Management

//

RECEIVED A

U.S. Nuclear Regulatory Commission SEP13198E>

Washington, D.C. 20555

Dear Mr. Scroggins:

ro 6

CD 4

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 MONTHLY OPERATING REPORT Enclosed is the subject monthly report which covers the operating statistics for the month of August 1985. This report is submitted per Section 6.9.1.6 of t'he Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours, K.W. Cook Nuclear Support & Licensing Manager KWC:GEW:sms Enclocure cc:

R.D. Martin, NRC Region IV NRC, Director, Office of I&E G.W. Knighton, NRC-NRR NRC Resident Inspectors Office INPO Records Center (J.T. Wheelock)

B.W. Churchill W.M. Stevenson 6

1 I