W3P85-0194, Forwards Update to .Mode 4 Achieved on 850123. Delay of 10 Days Expected in Achieving Mode 3
| ML20104B873 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 01/24/1985 |
| From: | Drummond F LOUISIANA POWER & LIGHT CO. |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| W3P85-0194, W3P85-194, NUDOCS 8502040297 | |
| Download: ML20104B873 (2) | |
Text
m o
9 Louisiama / 44 0 -.
G
.e -
POWER & LIGHT / NEW OR.EANS LOUSANA 70174-0008 9 (504)3SS 2345 MIDDLE SDUTH UTluTIES SYSTEM January 24, 1985 W3P85-0194 3-A1.01.04 A4.05 Director of Nuclear Reactor Regulation Attention:
Mr. G.W. Knighton Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
SUBJECT:
Waterford 3 Docket No. 50-382 Major Milestones for Waterford 3 Startup
REFERENCE:
W3P85-0151, dated 1/21/85
Dear Mr. Knighton:
The purpose of this letter is to update the above reference.
Please note in the Attachment that Mode 4 was achieved on 1/23/85. A delay of approximately ten (10) days is currently expected in achieving Mode 3.
We will continue to provide regular updates of this schedule.
Very truly yours, W **
F. J. Drummond Nuclear Services Manager FJD/RWP/ch Attachment cc:
E.L. Blake, W.M. Stevenson, R.D. Martin, D.M. Crutchfield, J. Wilson, G.L. Constable 8502040297 850124 PDR ADOCK 05000382
,9 p
PDR V,
I I
s m
. ATTACHMENT LWATERFORD 3
-MAJOR MILESTONES-t
' SEQUENCE OF. EVENTS PROJECTED ACTUAL
- 1) Enter Mode 6 - Begin-Core Load 12/19/84 12/18/84
- 2) Complete Core Load 12/23/84
- 3) Enter Mode 5 1/3/85 12/30/84
- 4) Enter _ Mode 4 - Begin PCHFT 1/13/85 1./23/85
~
5)' Enter Mode 3 1/21/85
- 6) Enter Mode 2 2/18/85 (Initial. Criticality and Begin Low Power Physics Testing)
- 7) NRC. Issuance Full Power OL 2/26/85 x
- 8) Enter Mode 1 2/28/85~
- 9) Begin Power'5scension Testing
.2/28/85
- 10) Begin Commercial Operation 6/08/85
- l Currently expecting a ten (10) day delay in achieving Mode 3
.