Monthly Operating Rept for Dec 1984
ML20112G970
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/31/1984
From: Cook K, Geoffrey Miller
LOUISIANA POWER & LIGHT CO.
To: Barry L
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
W3P85-0057, W3P85-57, NUDOCS 8501160584
Download: ML20112G970 (6)


Text

, OPERATING DATA REPORT UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA DATE: JANUARY 1985 OPERATING STATUS

1. Docket: 50-382 Notes (1) Maximus Dependable
2. Reporting Period: DECEMBER 1984 a ty r ss and
3. Utility

Contact:

determined after the SAM ALLEMAN 100% warranty run.

Phone Number: (504) 467-8211

4. Licensed Thermal Power (Wt): 3390
5. Nameplate Rating (Gross Mwe): 1153
6. Design Electrical Rating (Net We): 1104
7. Maximum Dependable Capacity (Gross We): (Note 1)

- 8. Maximum Dependable Capacity (Net We): (Note 1)

9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons: N/A
10. Power Level To Which Restricted, if Any (Net We): 11. Reasons For Restrictions, If Any: Operating License limited to 5% Rated Thermal Power This Month Yr.-to-Date Cumulative
12. Hours In Peporting Period 13. Number Of Hours Reactor Was Critical 14. Reactor Reserve Shutdown Hours 15 Hours Generator on-Line 16. Unit Reserve Shutdown Hours l 8501160584 841231 b It PDR ADOCK 05000302 R PDR  ;

e OPERATING DATA REPORT (Continued)

This Month Yr.-to-Date Cumulative

17. Gross Thermal Energy Generated (MWH) 18. Gross Electrical Energy Generated (MWH) 19. Net Electrical Energy Generated (MWH) 20. Unit Service Factor N/A N/A N/A
21. Unit Availability Factor N/A N/A N/A
22. Unit Capacity Factor (Using MDC Net) N/A N/A N/A
23. Unit Capacity Factor (Using DER Net) N/A N/A N/A
24. Unit Forced Outage Rate 25. Unit Forced Outage Hours 26. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

27. If' Shut Down At End of Report Period, Estimated Date Of Startup:
28. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 2/85 INITIAL ELECTRICITY 3/85 COMMERCIAL OPERATION 6/85 4

l 1

i

l l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-382 UNIT WATERFORD 3 DATE JANUARY 1985 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 MONTH DECEMBER 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe' -Net) (MWe-Net) 1 17 2 18 3 19 4 20 5 21 6 22 7 23 8 24 9 25 10 26 11 27  ! 12 28 13 29 14 30 15 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 DECEMBER 1984 On December 18, 1984 at 13:00 the unit received a low power operating license which limited operation to 5% rated thermal power. Fuel load was started on December 18 at 23:30 and was completed on December 23 at 15:00. Reactor core verificatica, core alignment checks, installation of the upper guide structure and incore instrumentation, coupling and verification of control element assemblies and reactor vessel stud tensioning were completed. On December 30 at 21:00 the unit entered Mode 5 (cold shutdown).

}

, or SPRING-LOADED PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of December 1984, there were no spring-loaded pressurizer safety valve failures or challenges.

{_.__,

f OUISI ANA / 44= oe-o~oe ra r . o .ox .oo.

I O W E R & L i G H T / NEW oALEANS LOUSMNA 70174 4008 . (504)386-9345 January 11, 1985 W3P85-0057 3-A1.01.04 A4.05 Mr. Learned W. Barry Director and Controller Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Barry:

Subject:

Waterford 3 SES Docket No. 50-382 MONTHLY OPERATING REPORT Enclosed is the subject monthly report which covers the operating statistics for the period of December 18 (license effective date) through December 31, 1984. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-26.

Very truly yours, f c. dY K.W. Cook Nuclear Support & Licensing Manager KWC:CEW:sms Enclosure cc: R.D. Martin, NRC Region IV NRC, Director, Office of I&E G.W. Knighton, NRC-NRR D.M. Crutchfield, NRC-NRR NRC Resident Inspectors Office INPO Records Center (D.L. Gillispie)