W3P84-3221, Interim Potentially Reportable Deficiency Rept 180 Re Failure to Maintain Adequate Document Control of Vendor Manuals.Initially Reported on 841019.Requests Addl Time to Evaluate Safety Significance.Next Rept by 841217

From kanterella
(Redirected from W3P84-3221)
Jump to navigation Jump to search
Interim Potentially Reportable Deficiency Rept 180 Re Failure to Maintain Adequate Document Control of Vendor Manuals.Initially Reported on 841019.Requests Addl Time to Evaluate Safety Significance.Next Rept by 841217
ML20099K790
Person / Time
Site: Waterford 
Issue date: 11/20/1984
From: Cook K
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
180, W3P84-3221, NUDOCS 8411290563
Download: ML20099K790 (1)


Text

LO UISI AN A / e oe-o~o. emeer o oox.00.

POWER & LIGHT / NEW OALEANS LOVSIANA 70174 4000

. (504)388-2345 MIDDLE SOUTH UTIUTIES SYSTEM W3P84-3221 Q-3-A35.07 3-A,1. 01. 04 A4.05 Mr. John T. Collins Regional Administrator, Region IV U.S. Nuclear Regulatory Commission g

611 Ryan Plaza Drive, Suite 1000 a

l Arlington, Texas 76011

.[.

NOV 2 0 S84 9

l j

Dear Mr. Collins:

di iO, a

SUBJECT:

Waterford 3 SES Docket No. 50-382 Potentially Reportable Deficiency No. 180

" Failure to Maintain Adequate Document Control of Vendor Manuals"

REFERENCES:

1.

Telecon on 10/19/84 between G.E. Wuller (LP&L) and T.A. Flippo (NRC) 2.

W3P84-2386 from K.W. Cook (LP&L) to J.T. Collins (NRC),

dated 9/13/84 In accordance with 10CFR50.55(e), LP&L provided telephone notification on September 18, 1984 of the subject deficiency. Via Reference 1, LP&L obtained an extension to November 16, 1984 for submittal of the written report on PRD-180. The Reference 2 letter provided LP&L's response to related Violation No. 8425-01 which provided details on corrective actions planned and underway to resolve this violation.

LP&L requires additional time to evaluate the safety significance of PRD-180 for reportability determination of the deficiency per 10CFR50.55(e) guidance.

LP&L has, therefore, rescheduled the submittal of the written report on PRD-180 for December 17, 1984.

If you have any questions, please contact Mr. G.E. Wuller at (504) 464-3499, Onsite Licensing.

Yours very truly, 8411290563 841120 PDR ADOCK 05000382 K.W. Cook S

PDR Nuclear Support & Licensing Manager KWC/GEW/pcl cc: NRC, Director, Office of I&E INPO Records Center (D.L. Gillispic)

NRC, Director, Of fice of Management E.L. Blake NRC-NRR, G.W. Knighton W.M. Stevenson NRC-NRR, D.M. Crutchfield C&-29

  • ID