W3P82-1733, Forwards Proprietary & Nonproprietary Versions of Waterford 3,Cycle 1 Cpc/Ceac Phase 1 Software Verification Test Rept & Waterford 3,Cycle 1 Cpc/Ceac Phase II Software Verification Test Rept. Affidavit Encl

From kanterella
(Redirected from W3P82-1733)
Jump to navigation Jump to search
Forwards Proprietary & Nonproprietary Versions of Waterford 3,Cycle 1 Cpc/Ceac Phase 1 Software Verification Test Rept & Waterford 3,Cycle 1 Cpc/Ceac Phase II Software Verification Test Rept. Affidavit Encl
ML20063D193
Person / Time
Site: Waterford 
Issue date: 06/25/1982
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Tedesco R
Office of Nuclear Reactor Regulation
Shared Package
ML19268B078 List:
References
W3P82-1733, NUDOCS 8207010357
Download: ML20063D193 (2)


Text

-

(

\\

1 l

l OUISIANA P O W E R & L i G H T! P O BOX 6008 + NEW OnLEANS. LOUISIANA 70174

,42 OcLAnonoe srnest

  • (504) 366-2345

$NNbs$

June 25, 1982 L. v. MAURIN Vice President Nuclear Operations W3P82-1733 3-A1.01.04 Q-3-A29.20 Mr. R. L. Tedesco Assistant Director of Licensing g QC;-

U.S. Nuclear Regulatory Commission Washington, D

. 20555

Subject:

Louisiana Power and Light Company Waterford Steam Electric Station - Unit No. 3 CPC/CEAC/ Reactor Power Cutback

Reference:

(a) LD-81-077, October 30, 1981

Enclosures:

(1) CEN-207(c)-P & NP, Waterford-3 Cycle 1 CPC/CEAC Data Base Document, June, 1982 (2) CEN-209(c)-P & NP, CPC/CEAC System Phase I Software Verification Test Report, Waterford-3 Cycle 1 June, 1982 (3) CEN-208(c)-P & NP, Waterford-3 Cycle 1 CPC/CEAC Phase II Software Verification Test Report (4) Affidavit of proprietary status pursuant to 10 CFR 2.790

Dear Mr. Tedesco:

The NRC staff identified, in Question 221.15, specific information re-garding the CPC/CEAC system which was required for their review prior to issuance of an OL.

This information is also identified in Section 4.4.1 of the Safety Evaluation Report (NUREG-0787, July, 1981).

Subsequently, LP&L and Combustion Engineering met with the N'IC staff on October 2, 1981, to discuss the CPC software improvements anticipated to g Df accommodate tha Reactor Power Cutback.

The staff identified additional information which would be needed in advance of OL issuance as the

)3 result of these changes, and a schedule was discussed with the staff and 1/

submitted in reference (a).

g,/f (2), and (3) are transmitted herewith, k t',

fy In fulfillment of the commitments made in reference (a), copies 0001 y *_.c through 0003 of Enclosures (1),

Non-proprietary copies are also attached.

g inP (PbR nP ps oc HTd 8

IV 8207010357 820625 PDR ADOCK 050003B2 A

PDR

Mr. R. L. Tcdsceo W3P82-1733 Peg 2 Two.

Please be advised that the data listed in Enclosures (1). (2), and (3) contains information which is proprietary to C-E.

Pursusat to Section 2.790 10 CFR part 2, you are requested to withhold this information from public disclosure. An affidavit attesting to the proprietary nature of the material is provided as Enclosure (4). Also, in accordance with 10 CFR Section 2.790(b), we recognize that withholding this information from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the information.

If you should have any questions concerning the proprietary nature of the material transmitted herewith, please address these questions directly to:

Mr. A. E. Scherer Director of Nuclear Licensing (9438-1922)

Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, CT 06095 We also request that you provide a copy of any questions concerning the proprietary nature of this submittal to Louisiana Power and Light Company.

Yours very truly, L. V. Maurin LVM/RMF/pco Attachment ec: