Entergy Nuclear South Entergy Operations, Inc.

172E5 River Road Killona, LA 70057-3093 Entergy Tel .504-739-6780 Fax 504-739-6698 ttanker@entergy.com Tom Tankersley Licensing Manager Waterford 3 W3Fl-2006-0011 February 24, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Fitness for Duty Performance Data Six Month Report Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

Dear Sir or Madam:

In accordance with 10CFR26.71 (d), Entergy Operations, Inc. hereby submits the fitness for Duty Performance Data for the six month period from July 1, 2005 through December 31, 2005.

There are no new commitments contained in this submittal. Should you have any questions concerning this submittal, please contact Oscar Pipkins at (504) 739-6707 or Dee Childress at (504) 739-6974.

Sincerely, TET/OPP/cbh Attachment(s)

,A-CD-A

W3F1-2006-00111 Page 2 cc: Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. Mel B. Fields Mail Stop O-07D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1700 K Street, NW Washington, DC 20006-3817 Morgan, Lewis & Bockius LLP ATTN: T.C. Poindexter 1111 Pennsylvania Avenue, NW Washington, DC 20004

Attachment I To W3F1I-2006-0011 Fitness For Duty Program Six Month Performance Report July 1, 2005 Through December 31, 2005

Fitness for Duty Program Six Month Performance Report July - December 2005 PROGRAM

SUMMARY

The Waterford 3 annual random testing rate is 50 percent. During this reporting period, approximately 29.83 percent of the population has been randomly tested.

The rate of positive tests from random testing is 0.35 percent. The total random percentage for the year is 54.4 percent.

POSITIVE RESULTS:

As shown on the attached sheets, there were two positive tests during this reporting period. One confirmed positive for cocaine and one confirmed positive for alcohol.

MANAGEMENT ACTIONS:

During this reporting period, three for-cause tests were requested. Two were requested because of accidents. Both samples returned negative results. The other was requested due to a smell of alcohol. This sample was confirmed positive for alcohol. Management was notified and the individual's access was denied. The file was annotated to reflect the positive result and denial of access.

One contractor tested positive during random testing. Management was notified and his access was denied. His file was annotated to reflect the positive result and denial of access.

Three follow-up samples were collected from licensee employees during this reporting period. All samples returned negative results.

EVENTS REPORTED TO THE NRC:

During this reporting period, there weire no violations of the fitness for duty program that were reportable.

PROGRAM EVALUATION:

No programmatic problems were identified during this reporting period.

CL-02 1 Page 1 Rev. 1

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR216 Entergy Operations, Inc. December 31, 2005 Company 6 Months Ending Waterford 3 SES, 17265 River Road, Killona, LA 70057 Location Dee R. Childress, Supervisor, Security/Fitness for Duty (504)739-6974 Contact Name Phone (Include Area Code)

Cutoffs: Screen / Confirmation Q AppendixAto IOCFR26 Marijuana 100 and 50 / 15 Amphetamines 1000 / 500 N /A I Cocaine 300 / 150 Phencyclidine 25 I 25 N /A Opiates 300 / 300 Alcohol (%BAC) 0.04% NI A Licensee Long-Term Short-Term Testing Results Employees Contractor Contractor Personnel Personnel Average Number with Unescorted Access 743.03 N/ A 225.64 Categories it Tested Positive Tested Positive Tested Positive Pre-Access 20 0 N/A N/A 51 0 For-Cause (Post accident) 1 0 N/ A N/ A 1 0 For-Cause (Behavior) 0( N /A N /A 1 Random 212 0 N/A N/A 77 1 Follow-Up 3 0 N/A N/A 0 0 Other 0 0 N/A N/A 0 0 Total 236 () N/A N/A 130 2 CL-021 Page 2 Rev. 1

BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES July - December 2005 Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol Refusal 1 2 3 4 5

....._ _ _to Test Licensee Employees 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A Long-Term Contractor N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Short-Term Contractor 0 I 0 0 0 1 0 N/A N/A N/A N/A N/A Total 1 0 4 1 0 1 0 1 0 11 1 0 1 N/A INA IN/A IN/A N/A CL-021 Page 3 Rev. 1