ULNRC-06928, Correction to Owners Activity Report (OAR-1 Form) for Cycle/Refuel 26
| ML25064A513 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 03/05/2025 |
| From: | Elwood T Ameren Missouri, Union Electric Co |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| Shared Package | |
| ML25064A511 | List: |
| References | |
| ULNRC-06928 | |
| Download: ML25064A513 (1) | |
Text
.
.t
.t
.t Callaway Plant 8315 County Road 459 : Steedman, MO 65077 : AmerenMissouri.com
.t March 5, 2025 ULNRC-06928 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.55a Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
RENEWED FACILITY OPERATING LICENSE NPF-30 CORRECTION TO OWNER'S ACTIVITY REPORT (OAR-1 FORM)
FOR CYCLE/REFUEL 26
References:
- 1. Ameren Missouri letter ULNRC-06852, "Callaway Plant, Unit 1 - Owner's Activity Reports (OAR-1 Forms) for Cycle/Refuel 26," dated March 5, 2024 (ADAMS Accession No. ML24065A298)
- 2. Enclosure to Ameren Missouri letter ULNRC-06852, "Enclosure - Callaway Nuclear Plant: Form OAR-1 Owner's Activity Report," dated March 5, 2024 (ADAMS Accession No. ML24065A299)
By letter dated March 5, 2024 (Reference 1), Union Electric Company (Ameren Missouri) submitted Owner's Activity Reports (OAR-1 forms) for Cycle 26 and Refuel 26 activities at the Callaway Plant (Reference 2). However, an error was identified on the OAR-1 form for Inservice Inspection (ISI) and Repair/Replacement activities. Specifically, the OAR-1 form did not identify use of Code Case N-729-6, "Alternative Examination Requirements for PWR Reactor Vessel Upper Heads with Nozzles Having Pressure-Retaining Partial-Penetration WeldsSection XI, Division 1," as it should have. The error has now been corrected, and the purpose of this letter is to provide the corrected OAR-1 form via the enclosure to this letter.
The enclosed OAR-1 form is being submitted pursuant to the provisions of the applicable revisions of ASME Boiler and Pressure Vessel Code Case N-532-5, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission," and Code Case N-892, "Alternative Requirement for Form OAR-1, Owner's Activity Report, Completion Time Section XI, Division 1."
~~
WAmeren MISSOURI
ULNRC-06928 March 5, 2025 Page 2 of 4 This letter does not contain new commitments.
Please contact Thomas B. Elwood at (314) 225-1905 for any questions about this submittal.
Sincerely,
~A.~
Thomas B. Elwood Manager, Regulatory Affairs ESS
Enclosure:
OAR-1 Form (2)
ULNRC-06928 March 5, 2025 Page 3 of 4 cc:
Mr. John Monninger Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. M. Chawla Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8B1A Washington, DC 20555-0001
ULNRC-06928 March 5, 2025 Page 4 of 4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 6500 West Freeway, Suite 400 Fort Worth, TX 76116 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
F. M. Diya K. C. Scott T. M. Hart J. G. Beck T. A. Witt T. B. Elwood NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)