Owners Activity Report (OAR-1 Forms) for Cycle 19 and Refuel 19
ML13234A056
Person / Time
Site: Callaway 
Issue date: 08/21/2013
From: Maglio S
Ameren Missouri
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-06021
Download: ML13234A056 (8)


Text

~~

WAmeren MISSOURI Callaway Plant August 2I, 20I3 ULNRC-0602I U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000I Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 OWNER'S ACTIVITY REPORTS (OAR-1 FORMS) FOR CYCLE 19 AND REFUEL 19 Please find enclosed the Owner's Activity Reports (OAR-I forms) for Cycle I9 and Refueli9 activities at Callaway Plant. The reports are submitted pursuant to the provisions of ASME Boiler and Pressure Vessel Code Case N-532-4, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission."

The OAR-I forms enclosed are associated with the following Cycle I9 and Refuel I9 activities at Callaway Plant:

1. lnservice Inspection and Repair/Replacement activities, and
2. Containment Inservice Inspection pursuant to ASME Section XI, subsection IWE.

In accordance with Code Case N-532-4, each attached OAR-I form includes a listing of items with flaws or relevant conditions that required evaluation for continued service (Table I) and an abstract of repair/replacement activities required for continued service (Table 2).

This letter does not contain new commitments. If there are any questions, please contact J.P. Kovar at (3I4) 225-1478.

Sincerely,

,C. A.~~

S.A.Ma~

Regulatory Affairs Manager PO Box 620 Fulton, MO 65251 AmerenMissouri.com

ULNRC-06021 August 21, 2013 Page 2 JPK/nls Enclosed: OAR-1 forms (2) cc:

Mr. Steven A. Reynolds Acting Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738

ULNRC-06021 August 21, 2013 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Other Situations ULNRC Distribution:

A. C. Heflin F. M. Diya C. 0. Reasoner III B.L.Cox L. H. Graessle S. A. Maglio Corporate Communications NSRB Secretary T. B. Elwood STARS Regulatory Affairs Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission

CALLAWAY NUCLEAR PLANT FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number 19 Plant Callaway Energy Center, P. 0. Box 620, Fulton, MO 65251 Unit No.

Commercial service date 12/19/1984 Refueling outage no.

(if applicable)

Current inspection interval 3rd (1st, 2nd, 3rd, 4th, other)

Current inspection period 3rd (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 1998 Edition with 2000 Addenda Date and revision of inspection plans 7/11/2012, Revision 6 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Inspection plan Code Cases used N-532-4 (if applicable)

CERTIFICATE OF CONFORMANCE 19 Same as I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 19 (refueling outage number) of Section XI.

£?I 19 I z(f)/3

~ I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Missouri and employed by of HSBCT Hartford, CT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/

replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

~~

.. ~~r"-'--L-

~£~:-

Commissions tJ£.#!'/tJ:S5#N/

/i1&#16Z.

~~gnature National Board, State, Province, and Endorsements Date Page 1 of3

CALLAWAY NUCLEAR PLANT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category Item Description Evaluation Description and Item Number F-A, F1.20 2-BG-02-H011, frame CAR 201301702, Evaluation of clearances style support with between piping and support horizontal members above and below horizontal pipe Page 2 of3

TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Work Date Completed Repair/Replacement Plan i

Number L_

N_Qne None

~one __ -* __ -* __________

None None I

Page 3 of3

CALLAWAY NUCLEAR PLANT FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number Plant Unit No.

---;:-:-----::----:-:--:---- Commercial service date (if applicable)

Current inspection interval Current inspection period Edition and Addenda of Section XI applicable to the inspection plans Date and revision of inspection plans 19 Callaway Plant 12/1911984 2"d (IWE Program)

(1st, 2nd, 3rd, 4th, other) 2"d (IWE Program)

(1st, 2nd, 3rd)

Refueling outage no.

2001 Edition with 2003 Addenda (IWE Program)

IWE Program: 12/15/2009, Rev. 3 19 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used N-532-4, N-685 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 19 (refueling outage number) conform to the requirements of Section XI.

j()

11 ~

18502...7.£...1£ f'ro.:;rarn Signed ~

1/, ~~

Owner Date

/

wneror Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Missouri and employed by HSBCT of Hartford, CT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/

replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature National Board, State, Province, and Endorsements Date Page 1 of2

CALLAWAY NUCLEAR PLANT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category Item Description Evaluation Description and Item Number None None None TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Work Date Completed Repair/Replacement Plan Number None None None None None Page 2 of2