~ 't-.
WAmeren MISSOURI Callaway Plant August 2, 2013 ULNRC-06019 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
FACILITY OPERATING LICENSE NPF-30 RESPONSE TO RAI SET #25 AND AMENDMENT 25 TO THE CALLAWAY LRA
References:
- 1) ULNRC-05830 dated December 15,2011
- 2) NRC Letter, "Request for Additional Information for the Review of the Callaway Plant, Unit 1 License Renewal Application, Set 25
{TAC No. ME7708)," dated July 12,2013
- 3) NRC Letter, "Safety Evaluation Report with Open Items Related to the License Renewal of Callaway Plant, Unit 1 (TAC NO. ME7708), dated April 23,2013
- 4) ULNRC-05979 dated April26, 2013 By the Reference I letter, Union Electric Company (Ameren Missouri) submitted a license renewal application (LRA) for Callaway Plant Unit 1. Reference 2 dated July 12, 2013 transmitted theJtwenty-fifth Request for Additional Information (RAI) related to our application.
Enclosure 1 contains Ameren Missouri's response to the individual request contained in the July 12, 2013 RAI. Enclosure 2 contains LRA Amendment 25 to reflect changes made as a result of the RAI response. This response provides information intended to assist the staff in closing Open Item B2.1.20-1 identified in Reference 3 .
PO Box 620 Fulton, MD 65251 AmerenMissouri.com
ULNRC-06019 August 2, 2013 Page2 Amendment 25 to the Callaway LRA also includes the following:
- Updates to LRA associated with implementation ofLR-ISG-2012-01, "Wall Thinning Due to Erosion Mechanisms," that was issued on April 19, 2013.
- Updates to LRA to include submerged ESW pump casings and supports, submerged fire water system sump pump casings, and supports for the diesel fuel oil transfer pumps and piping that are submerged in the diesel fuel oil storage tanks.
This LRA update is part of a corrective action for submerged pump casings and/or associated supports that were inadvertently omitted from the LRA. The error has been entered into the Callaway Corrective Action Program. The corrective action process has confirmed that no additional LRA updates are required for submerged pump casings and their associated supports.
- Updates associated with the Fatigue Monitoring Program.
These updates were discussed on a call with the staff on June 24, 2013 regarding responses to LRA RAI Set 23 (Reference 4) and provide information intended to assist the staff in closing Open Item 4.3.4-1 identified in Reference 3.
It should be noted that there are no changes to commitments contained within this transmittal.
If you have any questions with regard to this RAI response, or Amendment 25, please contact me at (573) 544-8272 or Ms. Sarah Kovaleski at (314) 225-1134.
I declare under penalty of perjury that the foregoing is true and correct.
Sincerely, mJJ;7J;J L Executed on: hlJG{J)L ~, 7
~0/3 Mark McLachlan Director, Systems Engineering DS/SGK/nls
Enclosures:
- 1) Request for Additional Information (RAI) Set #25 Response
- 2) Amendment 25, LRA Changes
ULNRC-06019 August 2, 2013 Page3 cc: U.S. Nuclear Regulatory Commission (Original)
Attn: Document Control Desk Washington, DC 20555-0001 Mr. Arthur T. Howell Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Samuel Cuadrado De Jesus Project Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 Mr. Gregory A. Pick U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511
ULNRC-06019 August 2, 2013 Page4 Index and send hardcopy to QA File Al60.0761 Hardcopy:
Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:
A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer B.L.Cox L. H. Graessle J. S. Geyer S. A. Maglio B. C. Daniels Corporate Communications NSRB Secretary M. A. McLachlan G. S.- Kremer S. G. Kovaleski T. B. Elwood G. G. Yates E. A. Blocher (STARS PAM COB)
STARS Regulatory Affairs Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)
Missouri Public Service Commission Ms. Leanne Tippett Mosby (DNR)