ULNRC-05983, Guarantee of Payment of Retrospective Premiums

From kanterella
(Redirected from ULNRC-05983)
Jump to navigation Jump to search
Guarantee of Payment of Retrospective Premiums
ML13119A143
Person / Time
Site: Callaway 
(NPF-030)
Issue date: 04/22/2013
From: Maglio S
Ameren Missouri
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML131190261 List:
References
ULNRC-05983
Download: ML13119A143 (4)


Text

~

~

SENSITNE INFORMATION-WITHHOLD UNDER 10 CFR 2.390(a)(4)

WAmeren Callaway Plant MISSOURI April22, 2013 ULNRC-05983 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

10 CFR 140.21 DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 GUARANTEE OF PAYMENT OF RETROSPECTIVE PREMIUMS Pursuant to the requirements of 10 CFR 140.21, Ameren Missouri hereby transmits the attached cash flow projection and certification to satisfy the guarantee of payment of retrospective premiums as required by this regulation. This statement covers 2012 (actual) and 2013 (projected) and shows that, if necessary, our cash flow would adequately cover payment of retrospective premiums within three months after submission of a statement.

It is Ameren Missouri's intent to continue to make this report on an annual calendar year basis. A follow-up report covering actual data for 2013 and projecting calendar year 2014, will be submitted by April30, 2014.

This letter does not contain new commitments.

If there are any questions, please contact Scott Maglio at (573) 676-8719.

Sincerely, 1:tti~

Regulatory Affairs Manager Enclosure to this letter contains sensitive information.

Withhold from public disclosure under 10 CFR 2.390(a)(4).

Upon removal of Enclosure, this letter is uncontrolled.

SENSITIVE INFORMATION-WITHHOLD UNDER 10 CFR 2.390(a)(4)

!ii!Y!YY!ii!Y!YY!Y!Y:T!YY!iii!YYYY!Y!YYYYYYYY!T PO Box 620 Fulton, MD 65251 AmerenMissouri.com

ULNRC-05983 April 22, 2013 Page 2 EMP/nls Enclosure

ULNRC-05983 April 22, 2013 Page 3 cc:

Mr. Arthur T. Howell Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B1 Washington, DC 20555-2738

ULNRC-05983 April 22, 2013 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution (without Enclosure):

A. C. Heflin F. M. Diya C. 0. Reasoner III L. H. Graessle S. A. Maglio T. B. Elwood R. Holmes-Bobo NSRB Secretary Mr. Ryan Nichols, Director (SEMA)

Mr. Thomas Mohr, Senior REP Planner (SEMA)

Mr. Tom Masso, REP Planner (SEMA)

STARSRA Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

Ms. Leanne Tippett Mosby (DNR)