ULNRC-05783, Facility Operating License NPF-30 Guarantee of Payment of Retrospective Premiums

From kanterella
Jump to navigation Jump to search
Facility Operating License NPF-30 Guarantee of Payment of Retrospective Premiums
ML111180238
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/27/2011
From: Maglio S
Ameren Missouri
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML111180237 List:
References
ULNRC-05783
Download: ML111180238 (3)


Text

~

~

SENSITIVE INFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4)

WAmeren Callaway Plant MISSOURI April 27, 2011 ULNRC-05783 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

10 CFR 140.21 DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 GUARANTEE OF PAYMENT OF RETROSPECTIVE PREMIUMS Pursuant to the requirements of 10 CFR 140.21, Ameren Missouri hereby transmits the attached cash flow projection and certification to satisfy the guarantee of payment of retrospective premiums as required by this regulation. This statement covers 2010 (actual) and 2011 (projected) and shows that, if necessary, our cash flow would adequately cover payment of retrospective premiums within three months after submission of a statement.

It is Ameren Missouri's intent to continue to make this report on an annual calendar year basis. A follow-up report, covering actual data for 2011 and projecting calendar year 2012 will be submitted by April 30, 2012.

This letter does not contain new commitments.

If there are any questions, please contact Scott Maglio at (573) 676-8719.

Sincerely, Scott A. Maglio

'lJtorf A 1lA2 Regulatory Affai s Manager EMF/nls Enclosure Enclosure to this letter contains sensitive information.

Withhold from public disclosure under 10 CFR 2.390(a)(4).

Upon removal of Enclosure, this letter is uncontrolled.

SENSITIVE INFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4)

PO Box 620 Fulton, MO 65251 AmerenMissouri.com

~

~

SENSITIVE INFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4)

WAmeren Callaway Plant MISSOURI April 27, 2011 ULNRC-05783 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

10 CFR 140.21 DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 GUARANTEE OF PAYMENT OF RETROSPECTIVE PREMIUMS Pursuant to the requirements of 10 CFR 140.21, Ameren Missouri hereby transmits the attached cash flow projection and certification to satisfy the guarantee of payment of retrospective premiums as required by this regulation. This statement covers 2010 (actual) and 2011 (projected) and shows that, if necessary, our cash flow would adequately cover payment of retrospective premiums within three months after submission of a statement.

It is Ameren Missouri's intent to continue to make this report on an annual calendar year basis. A follow-up report, covering actual data for 2011 and projecting calendar year 2012 will be submitted by April 30, 2012.

This letter does not contain new commitments.

If there are any questions, please contact Scott Maglio at (573) 676-8719.

Sincerely, Scott A. Maglio

'lJtorf A 1lA2 Regulatory Affai s Manager EMF/nls Enclosure Enclosure to this letter contains sensitive information.

Withhold from public disclosure under 10 CFR 2.390(a)(4).

Upon removal of Enclosure, this letter is uncontrolled.

SENSITIVE INFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4)

PO Box 620 Fulton, MO 65251 AmerenMissouri.com

~

~

SENSITIVE INFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4)

WAmeren Callaway Plant MISSOURI April 27, 2011 ULNRC-05783 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

10 CFR 140.21 DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 GUARANTEE OF PAYMENT OF RETROSPECTIVE PREMIUMS Pursuant to the requirements of 10 CFR 140.21, Ameren Missouri hereby transmits the attached cash flow projection and certification to satisfy the guarantee of payment of retrospective premiums as required by this regulation. This statement covers 2010 (actual) and 2011 (projected) and shows that, if necessary, our cash flow would adequately cover payment of retrospective premiums within three months after submission of a statement.

It is Ameren Missouri's intent to continue to make this report on an annual calendar year basis. A follow-up report, covering actual data for 2011 and projecting calendar year 2012 will be submitted by April 30, 2012.

This letter does not contain new commitments.

If there are any questions, please contact Scott Maglio at (573) 676-8719.

Sincerely, Scott A. Maglio

'lJtorf A 1lA2 Regulatory Affai s Manager EMF/nls Enclosure Enclosure to this letter contains sensitive information.

Withhold from public disclosure under 10 CFR 2.390(a)(4).

Upon removal of Enclosure, this letter is uncontrolled.

SENSITIVE INFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4)

PO Box 620 Fulton, MO 65251 AmerenMissouri.com

ULNRC-05783 April 27, 2011 Page 2 cc:

Mr. Elmo E. Collins, Jr.

Regional Administrator US. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector Callaway Resident Office US. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)

Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U S. Nuclear Regulatory Commission Mail Stop 0-8G 14 Washington, DC 20555-2738 Mr. James Polickoski Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U S. Nuclear Regulatory Commission Mail Stop 0-8BIA Washington, DC 20555-2738 ULNRC-05783 April 27, 2011 Page 2 cc:

Mr. Elmo E. Collins, Jr.

Regional Administrator US. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector Callaway Resident Office US. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)

Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U S. Nuclear Regulatory Commission Mail Stop 0-8G 14 Washington, DC 20555-2738 Mr. James Polickoski Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U S. Nuclear Regulatory Commission Mail Stop 0-8BIA Washington, DC 20555-2738 ULNRC-05783 April 27, 2011 Page 2 cc:

Mr. Elmo E. Collins, Jr.

Regional Administrator US. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector Callaway Resident Office US. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)

Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U S. Nuclear Regulatory Commission Mail Stop 0-8G 14 Washington, DC 20555-2738 Mr. James Polickoski Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U S. Nuclear Regulatory Commission Mail Stop 0-8BIA Washington, DC 20555-2738

ULNRC-05783 April 27, 2011 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution without enclosure for the following can be made via Responses and Reports ULNRC Distribution:

A. C. Heflin F. M. Diya C. O. Reasoner III L. S. Sandbothe S. M. Maglio T. B. Elwood S. L. Gallagher T. L. Woodward (NSRB)

Mr. Paul Parmenter, Director (SEMA)

Mr. Thomas Mohr, Senior REP Planner (SEMA)

Mr. John Campbell, REP Planner (SEMA)

Ms. Diane M. Hooper (WCNOC)

Mr. Tim Hope (Luminant Power)

Mr. Ron Barnes (APS)

Mr. Tom Baldwin (pG&E)

Mr. Wayne Harrison (STPNOC)

Ms. Linda Conklin (SCE)

Mr. John O'Neill (pillsbury Winthrop Shaw Pittman LLP)

Mr. Dru Buntin (DNR)

ULNRC-05783 April 27, 2011 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution without enclosure for the following can be made via Responses and Reports ULNRC Distribution:

A. C. Heflin F. M. Diya C. O. Reasoner III L. S. Sandbothe S. M. Maglio T. B. Elwood S. L. Gallagher T. L. Woodward (NSRB)

Mr. Paul Parmenter, Director (SEMA)

Mr. Thomas Mohr, Senior REP Planner (SEMA)

Mr. John Campbell, REP Planner (SEMA)

Ms. Diane M. Hooper (WCNOC)

Mr. Tim Hope (Luminant Power)

Mr. Ron Barnes (APS)

Mr. Tom Baldwin (pG&E)

Mr. Wayne Harrison (STPNOC)

Ms. Linda Conklin (SCE)

Mr. John O'Neill (pillsbury Winthrop Shaw Pittman LLP)

Mr. Dru Buntin (DNR)

ULNRC-05783 April 27, 2011 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution without enclosure for the following can be made via Responses and Reports ULNRC Distribution:

A. C. Heflin F. M. Diya C. O. Reasoner III L. S. Sandbothe S. M. Maglio T. B. Elwood S. L. Gallagher T. L. Woodward (NSRB)

Mr. Paul Parmenter, Director (SEMA)

Mr. Thomas Mohr, Senior REP Planner (SEMA)

Mr. John Campbell, REP Planner (SEMA)

Ms. Diane M. Hooper (WCNOC)

Mr. Tim Hope (Luminant Power)

Mr. Ron Barnes (APS)

Mr. Tom Baldwin (pG&E)

Mr. Wayne Harrison (STPNOC)

Ms. Linda Conklin (SCE)

Mr. John O'Neill (pillsbury Winthrop Shaw Pittman LLP)

Mr. Dru Buntin (DNR)