ULNRC-05250, Commitment Tracking System Summary of Commitment Revisions and Deletions Fuel Cycle Fourteen

From kanterella
Jump to navigation Jump to search
Commitment Tracking System Summary of Commitment Revisions and Deletions Fuel Cycle Fourteen
ML060310486
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/17/2006
From: Keith Young
Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-05250
Download: ML060310486 (2)


Text

AmerenUE PO Box 620 Callaway Plant Fulton, MO 65251 January 17, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC-05250 WAmeren Ladies and Gentlemen:

UE DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 Commitment Tracking System Summary of Commitment Revisions and Deletions Fuel Cycle Fourteen AmerenUE has endorsed the Nuclear Energy Institute's Guidelines for Managing NRC Commitments. The Guideline has been incorporated into Callaway procedure APA-ZZ-00540, "Commitment Management Program". There has been zero deleted Callaway Commitments between Refuel Thirteen (June, 2004) and Refuel Fourteen (November, 2005) that meet the criteria of the NEI Guideline for those Commitments requiring NRC notification within the next refuel outage interval summary report.

If you should have any questions on the above, please contact Mark Reidmeyer at 573/676-4306.

Sincerely, Keith D. Young Manager - Regulatory Affairs KDY/ewh koI a subsidiary of Ameren Corporation

ULNRC05250 January 17, 2006 Page 2 cc: U.S. Nuclear Regulatory Commission (Original and 1 copy)

Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street PO Box 360 Jefferson City, MO 65102-0360