Union Electric Callaway Plant PO Box 620 Fulton, MO 65251 July 9, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Ladies and Gentlemen:

ULNRC-05025 WAmeren UE DOCKET NUMBER 50483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 INSERVICE INSPECTION (ISI)

SUMMARY

REPORTS FOR INTERVAL 2 PERIOD 2 Attached please find the Inservice Inspection (ISI) Summary reports for Interval 2, Period 2 at Callaway Nuclear Power Plant. These reports describe ISI activities performed from May 5, 1998 through November 26, 2002. Contained within the ISI Summary Reports are the "Owner's Data Report for Inservice Inspections" (Form OAR-1) which presents the information required by Code Case N-532, as requested by ULNRC-03334 (Dated February 15, 1996) and approved by the NRC (Letter dated March 19, 1996).

Each OAR-I was prepared and certified upon completion of each refueling outage within the period (Refuel 10, Refuel 11, and Refuel 12) and is being submitted following the end of the period, as required by N-532.

This letter does not contain any new commitments.

If you have any questions regarding this submittal, please contact me at (573) 676-8659 or Mr. Dave Shafer, Superintendent - Licensing at (314) 554-3104.

Sincerely, Manath e D

Reg A a Manager - Regulatory Affairs BFH/jdg Enclosures fo 4l a subsidiry efAmeren Coiporatfon

ULNRC-05025 N

July 9, 2004 Page 2 Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street PO Box 360 Jefferson City, MO 65102-0360 Mr. Jerry B. Uhlmann Director Missouri State Emergency Management Agency P.O. Box 116 Jefferson City, MO 65102

ULNRC-05025 July 9, 2004 Page 3 bcc:

G. L. Randolph R. D. Affolter K. D. Young G. A. Hughes D. E. Shafer (470) (2 copies)

S. L. Gallagher (100)

S. L. Klang (NSRB)

M. A. Reidmeyer J. E. Ready E210.0001 A160.0761 Chrono file Bill Muilenberg Supervisor, Licensing WCNOC P.O. Box 411 Burlington, KS 66839 Mr. Scott Bauer Regulatory Affairs Palo Verde NGS P.O. Box 52034, Mail Station 7636 Phoenix, AZ 85072-2034 Mr. Scott Head Supervisor, Licensing South Texas Project NOC Mail Code N5014 P.O. Box 289 Wadsworth, TX 77483 Mr. John ONeill Shaw, Pittman 2300 N. Street N.W.

Washington, DC 20037 Diane Hooper STARS Projects Manager WCNOC P.O. Box 411 Burlington, KS 66839 Mr. Dennis Buschbaum Comanche Peak SES P.O. Box 1002 Glen Rose, TX 76043 Mr. Stan Ketelsen Manager, Regulatory Services Pacific Gas & Electric Mail Stop 104/5/536 P.O. Box 56 Avila Beach, CA 93424 Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109