ULNRC-04794, Core Operating Limits Report, Revisions 1 and 2
| ML030290671 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 01/21/2003 |
| From: | Blosser J AmerenUE |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| ULNRC-04794 | |
| Download: ML030290671 (2) | |
Text
/
/
January 21, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Ladies and Gentlemen:
ULNRC-04794 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT CORE OPERATING LIMITS REPORT
Reference:
ULNRC-04787, dated December 20, 2002 The Attachment to the letter referenced above transmitted the Callaway Plant Cycle 13 Core Operating Limits Report (COLR) to the NRC Staff for information.
Revisions 1 and 2 of the Cycle 13 COLR are now being transmitted as Attachments to this letter. Revision 1 to the COLR provides new W(z)s and Fq penalty factors due to the development of a new ANC model to account for the Axial Offset Deviation experienced at Callaway Plant at the beginning of Cycle 13. Revision 2 contains clarifications on the applicability of the Fq penalty factors.
Revisions 1 and 2 have been prepared in accordance with the requirements of Technical Specification 5.6.5. The original conclusions of the Cycle 13 Final Reload Safety Evaluation remain valid. If you have any questions concerning this report, please contact us.
Very truly yours, fr John D. Blosser Manager, Regulatory Affairs DJW/jdg
Attachment:
- 1. Appendix A, Callaway Cycle 13 Core Operating Limits Report, Rev. 1
- 2. Appendix A, Callaway Cycle 13 Core Operating Limits Report, Rev. 2 a subsidiary of Ameren Corporation One Ameren Plaza 1901 Chouteau Avenue PO Box 66149 St. Louis, MO 63166-6149 314 621.3222 AmerenUE wAmeren U1E
ULNRC-04794 January 21, 2003 Page 2 cc:
U. S. Nuclear Regulatory Commission (Original and 1 copy)
Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Mr. Ellis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7El Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Ron Kucera Department of Natural Resources P.O. Box 1756 Jefferson City, MO 65102