ULNRC-03455, Responds to NRC Bulletin 96-001, Control Rod Insertion Problems. Core Map & Rod Drop Time Data,Provided

From kanterella
(Redirected from ULNRC-03455)
Jump to navigation Jump to search
Responds to NRC Bulletin 96-001, Control Rod Insertion Problems. Core Map & Rod Drop Time Data,Provided
ML20128G375
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/30/1996
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-96-001, IEB-96-1, ULNRC-03455, ULNRC-3455, NUDOCS 9610090017
Download: ML20128G375 (5)


Text

... -. -.. _.

1901 Chouteau Avenue Post Othce Box 149 St Louis, Missoun 63166 314-554-2650 i

1 Union 0 '" sa"c"

.Etacrarc

P'****'

ic ::=c *c"'"c"'

\\

u hS i

U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Mail Station Pl-137 j

Washington, D.C.

20555 l

]

Gentlemen:

ULNRC-03455 l

DOCKET NLMBER 50-483 CALLANAY PLANT

]

CONTROL ROD INSERTION PROBLEMS j

References:

1) ULNRC-3360, dated April 4, 1996 j
2) NRC letter dated September 4, 1996
3) ?"RRC-3 4 4 7, dated September 20, 1996 j
4) ULNRC-3454, dated September 27, 1996

]

l The referenced letters pravided Union j

j Electric's response to Bulletin 96-01, " Control Rod Insertion Problems." is an updated core map for Callaway Cycle 9 which shows projected burnups i

for fuel assemblies in rodded locations.

This replaces j

the information provided in Attachment 4 of Reference 1. of this letter is a copy of from Reference 4, which has been annotated to identify the eight rodded assemblies from Cycle 8 4

that will be in rodded locations in Cycle 9.

The core locations for Cycle 9 are provided in the margin.

4 We are available to discuss this matter with you at your earliest convenience.

Very truly yours, Donald F. Schnell DES /plr i

Attachments

[hbh/

G2;c 9610090017 960930 PDR ADOCK 050004e3 G

PDR

5

\\

t

=

r J

STATE OF MISSOURI

)

)

SS CITY OF ST. LOUIS

)

i i

f' Alan C.

Passwater, of lawful age, being first duly sworn upon oath says that he is Manager, Licensing and Fuels (Nuclear) for Union Electric Company; that he has read the

{

foregoing document and knows the content thereof; that he has i

executed the same for and on behalf of said company with full i

power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.

\\

By Alan C.

Passwater Manager, Licensing and Fuels Nuclear 1

i 1

SUBSC IBED a d sworn to before me this 3 ay d

h W

1996.

ef -

,A s

T 4

AbdM A//

BARBARbJ. PFdFE NOTARY PUBUC-STATE OF MISSOURI MY COMMISSION EXPIRES APRIL 22, 1997 ST. LOUIS COUNTY.

1 s

J 4

4

O 4

cc:

M. H.

Fletcher Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwood, MD 20855-2432 L.

Joe Callan Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011-8064 j

Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Kristine M. Thomas (2)

Office of Nuclear Reactor Regulation j

U.S. Nuclear Regulatory Commission l

1 White Flint, North, Mail Stop 13E16 11555 Rockville Pike i

Rockville, MD 20852-2738 Manager, Electric Department Missouri Public Service Commission P.O.

Box 360 Jefferson City, MO 65102

i ULNRC-03455 CALLAWAY CYCLE 9 l

CONTROL ROD AND BURNUP INFORMATION R

P N

M L

K J

H G

F E

D C

B A

1 j

1 i

2 v.5 v.5 V-5 V-5 V-5 I

29.116 0.000 0.000 0.000 29.122 l

41.495 26.037 26.904 26.050 41.502

!3 v-5 V5 v-5 V-5 0.000 0.000 0.000 0.000 l

28.216 28.234 28.297 28.224 l

4 V-5 V-5 v-5 v.5 v.5 l

29.122 0.000 20.110 0.000 29.116

]

41.502 28.758 41.829 28.758 41.495 5

v.5 v-5 O.000 0.000 28.224 28.216 j

6 v5 v-5 v-5 v-5 v-5 l

0.000 0.000 0.000 0.000 0.000 26.050 28.334 28.909 28.334 26.037 j

7 v.5 v.5 i

0.000 0.000 28.297 28.234 j

8 v-5 v-5 v.5 v-5 v.5 v.5 V-5 l

0.000 20.110 0.000 27.662 0.000 20.110 0.000

)

26.904 41.829 28.909 47.396 28.909 41.829 26.904 i

9 v5 v-5 0.000 0.000 l

28.234 28.297 l

10 v-5 v5 v.5 v.5 v5 0.000 0.000 0.000 0.000 0.000 26.037 28.334 28.909 28.334 26.050 l

11 v5 v-5 j

0.000 0.000 l

28.216 28.224 j

12 V-5 V-5 v-5 V-5 V-5 29.116 0.000 20.110 0.000 29.122 41.495 28.758 41.829 28.758 41.502 13 V-5 v5 v-5 V-5 0.000 0.000 0.000 0.000 28.224 28.297 28.234 28.216 14 V-5 V-5 V-5 v-5 V-5 29.122 0.000 0.000 0.000 29.I16 41.502 26.050 26.904 26.037 41.495 15 FUEL TYPE CURR. BU FuelType Infonnation:

Westinghouse 17X17 Vantage-5 (V-5), Improved Zircaloy-4 cladding, EOCBU grids, and guide tubes; Guide Tube I.D. = 0.442 in.

ATTACHMENT 1

ULNRC-03455 e

l Attaciunent 2 a

)

Callaway Cycle 8 Rod Drop Time Data i

RCCA Drop Times (sec)

Assembly RCCA EOC7 EOC8 BOC8 j'

ID Bank ID Burnup BU Share Durnup BU Share Dashpot Turnaround d

X84 A

N/A N/A 28742 1.32 1.9 2.2 K87 A

N/A N/A 28742 1.32 1.8 2.2 I

K88 A

N/A N/A 28742 1.32 1.8 2.2 i

K91 A

N/A N/A 28742 1.32 1.8 2.2 l

K45 B

N/A N/A 25546 1.17 2.1 2.2 K46 B

N/A N/A 25546 1.17 2.1 2.2 K47 B

N/A N/A 25539 1.17 2.1 2.2 i

K53 B

N/A N/A 25539 1.17 2.1 2.2 K59 B

N/A N/A 25546 1.17 2.1 2.2 K61 B

N/A N/A 25546 1.17 1.9 2.2 K62 B

N/A N/A 25539 1.17 2.1 2.2 K64 B

N/A N/A 25539 1.17 2.1 2.2 K49 C

N/A N/A 26660 1.22 1.8 2.0 K54 C

N/A N/A 26660 1.22 1.8 2.0 K55 C

N/A N/A 26660 1.22 1.8 2.0 K58 C

N/A N/A 26660 1.22 1.8 2.0 K69 C

N/A N/A 28914 1.33 1.8 2.0 K74 C

N/A N/A 28914 1.33 1.8 2.2 K78 C

N/A N/A 28914 1.33 1.8 2.0 K79 C

N/A N/A 28914 1.33 1.8 2.0

)

H78 D-N/A N/A 48132 0.94 1.9 2.0 I

J12 D

26285 1.27 47240 0.96 1.9 2.0 J19 D

26285 1.27 47240 0.96 1.9 2.0 J20 D

26285 1.27 47240 0.96 1.9 2.0 J55 D

26285 1.27 47240 0.96 1.9 2.0 J14 SA 26801 1.30 38629 0.54 Note 3 2.2 J15 SA 26780 1.30 38614 0.54 Note 3 2.2 J29 SA 26801 1.30 38629 0.54 Note 3 2.2 J30 SA Q i 26801 1.30 38629 0.54 Note 3 2.2

'J32 SA 26780 1.30 38614 0.54 Note 3 2.2 gpaJ J40 SA 26801 1.30 38629 0.54 Note 3

'2.2 J44 SA n 26780 1.30 38614 0.54 Note 3 2.2

_L W

- J52 SA - 26780 1.30 38614 0.54 Note 3 2.2 P-V K81 SB SA N/A N/A 29122 1.34 Note 3 2.1 P-11 K83 SB N/A N/A 29116 1.34 Note 3 2.1

&lY K85 SB N/A N/A 29122 1.34 Note 3 2.1 B-l2.

K86 SB N/A N/A 29122 1.34 Note 3 2.3 t-sY K92 SB N/A N/A 29116 1.34 Note 3 2.1 B 'I K93 SB N/A N/A 29116 1.34 Note 3 2.1 D-1 K94 SB N/A N/A 29122 1.34 Note 3 2.1 M-2.

K96 SB N/7.

N/A 29116 1.34 Note 3 2.1 K17 SC N/A N/A 27683 1.27 Note 3 2.1 K20 SC N/A N/A 27683 1.27 Note 3 2.1 K28 SC N/A N/A 27683 1.27 Note 3 2.1 K35 SC N/A N/A 27683 1.27 Note 3 2.1 K13 SD N/A N/A 27676 1.27 Note 3 2.1 K15 SD N/A N/A 27676 1.27 Note 3 2.1 K25 SD N/A N/A 27676 1.27 Note 3 2.0 K27 SD N/A N/A 27676 1.27 Note 3 2.3 K67 SE N/A N/A 29334 1.35 Note 3 2.2 K68 SE N/A N/A 29334 1.35 Note 3 2.2 K75 SE N/A N/A 29334 1.35 Note 3 2.2 K77 SE N/A N/A 29334 1.35 Note 3 2.2 Cycle Burnup:

20656 21790 Note 3: Dashpot times available for Control Banks only