U-604484, October 1, 2016 to September 30, 2017, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report

From kanterella
(Redirected from U-604484)
Jump to navigation Jump to search
October 1, 2016 to September 30, 2017, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report
ML19119A084
Person / Time
Site: Clinton, 07201032  Constellation icon.png
Issue date: 04/24/2019
From: Kowalski J
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
U-604484
Download: ML19119A084 (1)


Text

Clinton Power Station ~

8401 Power Road Clinton, IL 61727

~ Exelon Generation U-604484 10 CFR 72.44 April 24, 2819 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRG Docket No. 50-461 7z_ I/) <f {.p / 1 z_-//) 3 z_

Subject:

Clinton Power Station, October 1, 2016 to September 30, 2017, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report

References:

1. Letter from Theodore Stoner (Exelon Generation Company, LLC) to U.S. NRG, "Clinton Power Station 2017 Annual Radioactive Effluent Release Report," dated April23,2018(U-604416)

In accordance with 10 CFR 72.44, "License conditions," paragraph (d)(3) and Holtec Certificate of Compliance (CoC) No. 1032, Appendix A, "Technical Specifications for the Hi-Storm FW MPG Storage System," Section 5.1, "Radioactive Effluent Con~rol Program," this letter provides the anrlual radioactive effluent release report for the Clinton Pdwer Station Independent Spent Fuel Storage Installation (ISFSI) for the period of October 1, 2016 to September 30, 2017.

During this period there were no radioactive effluents released from the Clinton Power Station ISFSI. Note that the ISFSI Annual Radioactive Effluent Release Report was provided in Reference 1 for the period of January 1, 2017 through December 31, 2017. However, the reporting period covered by Reference 1 is not consistent with the reporting period for the ISFSI Annual Radioactive Effluent Release Report specified in the Holtec Coe No. 1032, Appendix A, Section 5.1. Additionally, the submittal date requirements differ for each of the required reports.

This submittal is being provided to establish the ISFSI Annual Radioactive Effluent Release Report reporting period to facilitate future submittal date requirements. This issue has been entered into the Corrective Action Program under Issue Report 04236199.

There are no commitments contained in this letter.

Should you have any questions concerning this letter, please contact Mr. Dale Shelton, Regulatory Assurance Manager, at 217-937-2800.

Respectfully,

. ~

John Kowalski Plant Manager Clinton Power Station NAS/lm cc: Regional Administrator - NRG Region Ill NRG Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Emergency Management Agency