U-602218, Monthly Operating Rept for Nov 1993 for Clinton Power Station
| ML20058K219 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 11/30/1993 |
| From: | Hollon M, Phares R ILLINOIS POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| U-602218, NUDOCS 9312150003 | |
| Download: ML20058K219 (5) | |
Text
~
ts I..
!!!inois Power Company Chnton Power Station -
P O Box 678 Clinton. IL 61727 Tel 217 935-889
- POVIER u 6 2218 L30-93(12 -9 )-LP 8E.100c 10CFR50.36 December 9, 1993 Docket No. 50-461 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555
Subject:
C11nton Power Station, Unit 1 Facility Operating License NPF-62 November 1993 Monthly Operating Renort
Dear Sir:
P1 ease find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1,
for the period ending November 30, 1993.
Sincerely yours, t
4 R. F. Phares Director - Licensing McH/krm Attachment a
cc:
NRC Region III Regional Administrator h
NRC Resident Office Illinois Department of Nuc1 ear Safety n.
1500: ')
p'/
9312150003 931130
\\
PDR ADOCK 05000461 R
PM H
s
i Attachment l'
[
to U-602218 t
Page 1 of 4-l I
I t-k I
v r
CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES 6
i i
Month November 1993 f
a r
None h
l 3
i k
e
?
I l
s 4
= -..
.s j
~
i
'l to U-602218 j
Page 2 of.4 f
-AVERAGE DAILY UNIT POWER LEVEL
.. i DOCKET NO.
50-461 UNIT Clinton 1 l
DATE 11/30/93 i
COMPLETED BY-M. C. Hollon
-l l
TELEPHONE (217) 935-8881 X3537 MONTH November 1993 s
i
. DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PvWER LEVEL i
(MWe-Net)
(MWe-Net) l 1
0 17 0
f 2
0 18 0
3 0
19 0
4 0
20 0
5 0
21 0
i 6
0 22 0
7 0
23 0
)
8 0
24 0
9 0
25 0
.l 10 0
26 0
l 11 0
27 0
l 12 0
28 0
l 13 0
29 0
14 0
30 0
15 0
31 NA 16 0
i I
h l
L l
4
"~
to U-602218 Page 3.of 4 OPERATING DATA REPORT DOCKET NO.
50-461 UNIT Clinton 1 DATE ' 11/30/93 COMPLETED BY M.
C. Hollon TELEPHONE (217) 935-8881 X3537-OPERATING STATUS 1.
REPORTING PERIOD: November 1993 GROSS Il0URS IN REPORTING PERIOD: 720 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
2.8_9.4 8
MAX. DEPEND. CAPACITY (MDC) (MWe-Net): 930 DESIGN ELECTRICAL RATING (MWe-Net): 933 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None 4.
REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL...
0.0 6.432.2 36.905.8 6.
REACTOR RESERVE SHUTDOWN HOURS.........
0.0 0.0 0.0 7.
HOURS GENERATOR ON LINE............
0.0 6.427.0 35.882.8 8.
UNIT RESERVE SHUTDOWN HOURS...
0.0 4.0.
4.0 9.
' GROSS THERMAL ENERGY GENERATED (MWH)..
0 18.141.865 94.585.758
.10.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 6.014.752 31.271.782 11.
NET ELECTRICAL ENERGY GENERATED (MWH)..
0 5.752.363 29.739.023 12.
REACTOR SERVICE FACTOR..........
0.0%
80.2%
69.9%
13.
REACTOR AVAILAB7LITY FACTOR......
0.0%
80.2%
69.9%
14.
UNIT SERVICE FACTOR...................
0.0%
80.2%
68.0%
15.
UNIT AVAILABILITY FACTOR....
0.0S 80.2%
68.0%
16.
UNIT CAPACITY FACTOR (Using MDC).......
0.0%
77.2%
60.6%
17.
UNIT CAPACITY FACTOR (Using Design MWe) 0.0%
76.9%
60.4%
18.
UNIT FORCED OUTAGE RATE.........
0.0%
0.0%
10'. 6 % -
19.
SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS'(TYPE, DATE, DURATION OF EACH):
The fourth refueling outage began as scheduled on September 26, 1993.
The scheduling duration window is 65 days.
- 20.. IF SHUT DOWN AT END '0F REPORT PERIOD, ESTIMATED DATE OF STARTUP:
December 7. 1993
m to. U-602218 Page 4 of 4, UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-461 UNIT Clinton 1 DATE 11/30/93 COMPLETED BY 'M.
C. Hollon TELEPHONE (217) 935-8881 X3537 1
REPORT MONTH November 1993 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE NO.
DATE S: SCHEDULED (HOURS)
REASON (1)
REDUCING POWER (2) ACTIONS / COMMENTS 93-05 930926 S
720.0 C
4: Plant shutdown Plant remained shutdown continued from for the planned fourth previous refueling outage (RF-4).
reporting period i
(1) Reason A-Equipment Failure (explain), B-Maintenance or Test, C-Refueling, D-Regulatory Restriction, E-Operator Training & License Examination, F-Administrative, G-Operational Error (explain),
H-Other (explain)
(2) Method 1-Manual, 2-Manual Scram, 3-Automatic Scram, 4-Other (explain)
. _.. - - _.... _.. - _ _ _. -... - - _. -, _ _ - _ _.. _. _ - ~ _ ~ _. ~ _ __ -. _ _.. _ _ _. _ _ _ _ _ _ _ _ _ _ _