Text
//
p il DOCKET G8ER b;
- 1Tm0N RU E
-5
$2 6
s 9,) (p CLINTON POWER STATION. P.O. IOX 678. CLINTON. ILLINOIS 6 727 OG78. TELEPHONE (217193548p/ m,
~
UdNhC 110 AN 11 A10:20 June 6, 1990
,g g.,j g g 00CKileNG A Sti<vid BRANLH 4
Secretary of the Commission U. S. Nuclear Regulatory Commission Wshington, D. C.
20$55
Dear Sir:
This letter provides comment on a proposed rule change that was announced in the May 3, 1990 Federni Recister.
Illinois Power Company (IP) wishes to comment on the Petition for Rulemaking filed by Yankee Atomic Electricity Company.
Ip is strongly supportive of the change that would better coordinate the revisions of the Final Safety Analysis Report (FSAR) with refuelin6 cycles.
IP's Clinton Power Station is one of the nuclear power stations that will be issuing a new revision to the Safety Analysis Report at the same time the plant is entering a refueling outage this year. The Commission's approval of this Rulemaking change would provide for a more logical and timely basis for incorporating plant configuration and procedure changes in the future.
Additionally, IP believes the Commission would benefit from the procedure change as i
I well as the nuclear power companies in resource planning and budgeting.
Sincerely yours, Q
f F. A. Sp ngenh rg, IIP Manager Licce. sing aKd Safety SFB/alh l
~
t 9006th PDB gh g5\\D