U-600903, Monthly Operating Rept for Mar 1987

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1987
ML20235E487
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/31/1987
From: Spangenberg F
ILLINOIS POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
U-600903, NUDOCS 8707110081
Download: ML20235E487 (5)


Text

.

f 4

^

CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES 1

i Month March 1987 l

At 1530 on March 24, 1987 the plant was in cold shutdown for maintenance. During the performance of surveillance CPS 9030.01C015 [ Relief Valve-Reactor Pressure B21-N669A.(B,E,F) Channel Functional Checklist), Safety Relief Valve F041C actuated several times as the result of a failure in control circuitry. . The event i

is still under investigation. LER 87-019 will 'ue submitted to, report the details of the event, i

kDO k $5b PDR461 r' hDk 't!'

\ R

\>

i MONTHLY OPERATING REPORT FORMAT AND INSTRUCTIONS

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-461 UNIT Clinton 1

~ DATE 03/31/87 COMPLETED BY F. A. Spannenberg )

TELEPHONE (217) 935-8881 X3400 l

MONTH March, 1987 I l

DAY AVERAGE DAILY POWER LEVEL .I DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 0 17 0 l 1 0 18. 0 2

0 19 0 3

0 20 0 1

4 0 21 0 5

0 22 0 ,

6 0 23 0 7

0 24 0 l 8 I

0 25 0 9

0 26 0 10 0 27 0 11 l 0 28 0 12 0 29 0 13 0 30 0 14 0 31 0 15 16 0 INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month.- Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

OPERATING DATA REPORT

. l t

DOCKET NO. 50-461 UNIT Clinton 1 DATE 03/31/87

{ F. A. Spancenberg COMPLETED BY TELEPHONE (217) 935-8881 X3400 OPERATING STATUS

1. REPORTING PERIOD: March, 1987 GROSS HOURS IN REPORTING PERIOD: 744 l
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 144.7 MAX. DEFEND. CAPACITY (MWe-Net): Not Available DESIGN ELECTRICAL RATING (MWe-Net): 933
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 46.6 REASONS 70R RESTRICTION (IF ANY): Clinton-1 is in the start-up testing i 4 1 phase and is limited to 5% of rated power.  !

I THIS MONTH YR TO DATE CUMULATIVE 506 509 509

5. NUMBER OF HOURS REACTOR WAS CRITICAL.. .

0 0 0

6. REACTORRESERVESHUTDOWNHOURS.........

0 0 0

7. HOURS GENERATOR ON LINE................

0 0 0

8. UNIT RESERVE SHUTDOWN HOURS............

4283 4263 4283

9. GROSS THERMAL ENERGY GENERATED (MkH)...

0 0 0

10. GROSS ELECTRICAL ENERGY GENERATED (MWM) 0 0 0
11. NET ELECTRICAL ENERGY GENERATED (MWH)..
12. REACTOR SERVICE FACTOR................. N/A
13. REACTOR AVAILABILITY FACTOR. . . . . . . . . . . . N/A _

14 UNIT SERVICE FACTOR.................... N/A

15. UNIT AVAILABILITY FACTOR............... N/A
16. UNIT CAPACITY FACTOR (Using MDC)....... N/A
17. UNIT CAPACITY FACTOR (Using Design MWe) N/A
18. UNIT FORCED OUTAGE RATE................ N/A
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): Maintenance shutdown, September 17, 1987, 21 days.
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A FORECAST ACHIEVED
21. UNITS IN TEST STATUS (PRIOR TO COMKERCIAL OPERATION):

2/27/87 INITIAL CRITICALITY INITIAL ELECTRICITY (Synchronization) 04/19/87 COMMERCIAL OPERATION (Warranty Run) 10/19/87

0 EN R I I 0 RE A A I ME A L 4

UUI I S L g3 M S P N P QRTN RTSE X OD X re X. S ET E ANI C E I N E b T RSOli E ( TAN (

n1 N NTW LE AMRN C O e8 E OI E I GI R g8 M T SN NE R RNT O n8 M YEE EI DF TI A R)

O SFVP RAAI U i a LT SNNERN 7 p5 C EI LO RRA UTEl SNl E I S EI I VEI M n8S3 /

SO G AE RAMI A 1 o/ 9 S UEVE .

ECRN FT - RATLL A 6 t 1 N DV RE YTXAAP R O E NAB R IA ERNX C 4 n3 A) COO PRAH TRGR TOE S

- i/ 7 I T OTI TO O C NONOR 0l 3 1 C R TNT WFT E I TOESI( LLA 5C0F2 PSAE O N M .LATSI T AAM

( A RLMD LTE . PTELANNAR UUO E DOONE NMT I NUUREI RE DNNTH V ETSI R YI UC NUI FGECMEH OAAUT

.TEYE SAI AI FORE OQAEEPI DPT HMMA OI TBN I T I R TU I PTR SEMRROLAOO T NNA 0 C VERNQ RTSR A  : : : E  : :

UDD1 1 EPI OE EENO E : : : : : M1 234 T EP E VSI C RABCDE FGH E TE R ROACR R )

K EL ) )

C LE O )

2 1 2

(

O P T C 1

(

D M O ,

C

)

S' 2 N R(

O NO I W R T FORE C ODOW U 7 TO D 8 DGCP E 9 0NA 2 R 1 1

1 I EG TTRN R , ET I E h MUEC W c Hi1l 1 wrl O r STD oeo a P a E ld r M R at e D d ener N meh osi A

l i

oc ceu T oir h q S N R tidT e .

N O ) oan rm W M 1 l n a . a O ( o t . ncsr D T rsn ,t T R N t r e ef os U O O nomrii l

P S 1 1 ot uurtl iS E A C ar sdi a d u R E rt s T R ee s ed nn h pnrooa I TOi pr cm N

U N O)

I S TR 3 AU 8 R0 1 U1 1 D(

D D

EI E.

CU ERD POE YFI T F

T C

S F

S 7

8

/

2 E 2 T /

A 3 D 0 O 1 N

t Q r U- 600903 L30-87 (04 -15 )-L 1A.120 ILLINDIS POWER COMPANY JP cLINTON POWER STATiCN P.C. BCX 678. CLINTON. ILLINCIS 61727 April 15, 1987 Docket No. 50-461 .

Directer, Office of Resource Management U.S. Nuclear Regulatory Co= mission Washington, D.C. 20555

Subject:

Clinton Power Station, Unit 1 March 1987 Monthly Operating Report NPF-55 ,

Dear Sir:

Please find enclosed the monthly operating report for Clinton Power Station, Unit 1, for the period ending March 31, 1987.

Sincerely yours, F. A. Spange erg Manager - Licensing and Safety l l

GSL/bsa Enclosure cc: Regional Administrator, Region III, USNRC

.y l

l . _ _ _ _ _ _ _ _ _ _ _ _ _ -