1 i
(
M Lo
- .TXX-6945 h
5 Fi e # 10110
=
908.3 Ref #10CFR50.55(e) l TUELECTRIC November 17, 1987 wmiain c. counsu n u m,,, vwe ern a.
V. S. Nuclear Regulatory Commission j
ATTN:
Document Control Desk i
Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 AMP 0WER BUTT SPLICES SDAR:
CP-87-113 (INTERIMREPORT)
Gentlemen:
On October 19, 1987, we verbally notified your Mr. L. Ellershaw of a l
deficiency involving the use of Ampower butt splices for the connection of.
l field cables to penetration hardline conductors which is not in conformance with Amoower design specifications.
This condition was identified by site engineering personnel and is documented by Nonconformance Report (NCR)
CE-87-10802.
This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).
We are continuing our evaluation of the impact of this issue upon the safety of plant operations.
Our next report will be submitted no later than January 22, 1988.
Very truly yours, j
W. C. Coud W. G. Counsil Nt'
/E By: <
J.' S. Marshall 1
Supervisor,_ Generic WJH/mgt c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) l 8711230227 871117
/
PDR ADOCK 05000445 1
8 PDR E
4m North Olive Street LB 81 Dallas, Texas 7208 L-