TXX-6875, Interim Deficiency Rept CP-86-13 Re Computer Entry Error Which Could Invalidate Portions of Jet Impingement Load Review for High Energy Line Breaks.Initially Reported on 860305.Evaluation Continuing.Next Rept Expected by 880215

From kanterella
(Redirected from TXX-6875)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-13 Re Computer Entry Error Which Could Invalidate Portions of Jet Impingement Load Review for High Energy Line Breaks.Initially Reported on 860305.Evaluation Continuing.Next Rept Expected by 880215
ML20235Z151
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/16/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-13, TXX-6875, NUDOCS 8710200624
Download: ML20235Z151 (1)


Text

i i

i i

g h'

U lUSNRC-DS M

l Log # TXX-6875 l

M10C120 A 9 5~1

=.

.. =

File # 10110 l

r

=

903.6 i

Ref #.10CFR50.55(e) 7t# ELECTRIC i

i l:

Wimam G. Coumil nuwi,e viu ernuem October 16, 1987 U. S. Nuclear Regulatory Commission Atta: Document Control Desk Washington, D.- C.

20555 i

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 JET IMPINGEMENT LOAD REVIEW SDAR:

CP-86-13 (INTERIM REPORT) 1 Gentlemen:'

l i

On March 5, 1986, we verbally notified your Mr. T. F. Westerman of a

' deficiency involv_ing a computer entry error which could invalidate portions of the: Jet impingement load review for high energy line breaks.

This is an interim report of a potentially reportable item under the provisions of

.10CFR50.55(e). Our last interim report, logged TXX-6670, was submitted on August 19, 1987.

1

.We are continuing our_ evaluation of this issue and anticipate submitting our l

next report.no later than February 15, 1988.

l l

Very truly yours, f/'/iG W. G. Counsil CBC/grr c - Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) 1 8710200624 871016 PDR ADOCK 05000445 S

PDR b

t d0 MC North Olive Street LB 81 Dallas, Teus 7520I t