Interim Deficiency Rept CP-87-82 Re Discrepancies Observed in Fire Control Panels.Listed Deviations,Including Specs & Design & Vendor Drawings Noted.Initially Reported on 870831. Corrective Action Not Given.Next Rept Anticipated by 871124
ML20235L238
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/30/1987
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-87-82, TXX-6780, NUDOCS 8710050398
Download: ML20235L238 (1)


Text

n 1

==

Log # TXX-6780 L

File # 909.5 E

C 10110 I

Ref #10CFR50.55(e)

MlELECTR/C wmiam c. c, n

September 30, 1987-E.new,ne Yke PrnWent V,. S. Nuclear Regulatory Commission j

Attn: Document Control Desk l

Washington, DC 20555 j

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 FIRE DETECTION CONTROL PANELS l

SDAR: CP-87-82 (INTERIM REPORT)

)

Gentlemen:

I On August 31, 1987, we verbally notified your Mr. H. S. Phillips of a deficiency involving discrepancies which have been observed in the fire detection control panels.

This deficiency was discovered by Startup during

)

prerequisite testing and is addressed in Corrective Action Request (CAR) 87-J 061. This is an interim re provisions of 10CFR50.55(e) port of a potentially reportable item under the i

Specifically, during prerequisite testing in accordance with XCP-EE-25,'" Fire Detectors Zone Continuity and Calibration Check," deviations have been observed involving the specification, design drawings, vendor drawings and the installed panels. These discrepancies involve termination panels, terminal board positions / locations and printed circuit (PC) board identification.

We are continuing our evaluation and our next report on this issue will be submitted no later than November 24, 1987.

Very truly yours, 14 W. G. C unsil i

JDS/mgt

,/$ A/

By:

/

G. S. Keeley.

~

Manager, Nuclear Orm

~g c - Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) p*R?aR ?F44' p[o 1

/

MD North Olive Street LB 81 Dallas, Texas 75201