TXX-6704, Supplemental Deficiency Rept CP-86-46 Re Design Change to Vendor Supplied Equipment W/O Formal Evaluation.Initially Reported on 861021.Implementation of Gould Battery Rack Transverse Bracing Rework Continuing.Next Rept by 871204

From kanterella
(Redirected from TXX-6704)
Jump to navigation Jump to search
Supplemental Deficiency Rept CP-86-46 Re Design Change to Vendor Supplied Equipment W/O Formal Evaluation.Initially Reported on 861021.Implementation of Gould Battery Rack Transverse Bracing Rework Continuing.Next Rept by 871204
ML20237J995
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/31/1987
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-46, TXX-6704, NUDOCS 8709040154
Download: ML20237J995 (2)


Text

.

M llllll:' ':l1" Log -# TXX-6704 Fi1e # 10110-1 908.3

)

E E

. # 10CFR50.55(e).

Ref a

filELECTRIC

'4 William G. Coumil August 31,~1987 U. S. Nuclear Regulatory Commission i

Attn: Document Control Desk Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 GOULD BATTERY RACKS TRANSVERSE BRACING s

SDAR: CP-86-46 (SUPPLEMENTAL REPORT) l Gentlemen:

On October 21, 1986, we notified you by our letter, logged TXX-6052, of a deficiency involving a design change to vendor supplied equipment being made.

I without formal evaluation by the vendor, which we deemed reportable'under the

.{

provisions of 10CFR50.55(e). Our most recent report submitted to status the

)

l implementation of corrective action was logged TXX-6427. dated April 30,.1987.

]

J l

In our report TXX-6427 we noted the transverse bracing of the'gould batter racks would be reworked to comply with the original design of the two (2) ybolt.

connection.

Implementation of the' associated rework concerning both Units 1 i

and 2 is still in progress. Our original completion date of August 31,.1987 was not met due to scheduling concerns..

We anticipate submitting our next report no later than' December 4, 1987.

j d

Very truly-yours, j

W. G. ^otins11 1

f r

l By:

'v G. S. Keeley-Manager, Nuclear Lic n ing CBC/gj s

c - Mr. R. D. Martin, Regian,JV~

Resident Inspectors, CP$E6((3)' ~ 7 41 x

8709040154 070031 PDR ADOCK 05000445 S-PDR i

pj.-

ll '

400 North Olive Street - LB 81 Dallas. Texas 73201 '

]

-i

/[d4 1

w,---,

m. - - -r:

USNRC-OS 1911 SEP -3 ' A 9 21 l

l l

,