TXX-6694, Interim Deficiency Rept CP-87-22 Re Failure to Implement FSAR & Spec Requirements on Impact Testing of Matls Attached to Containment Liner.Initially Reported on 870617.Evaluation Underway.Next Rept Expected by 871026
| ML20237J590 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/31/1987 |
| From: | Counsil W, Keeley G TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-87-22, TXX-6694, NUDOCS 8709040015 | |
| Download: ML20237J590 (1) | |
Text
}
l i
t<og # TXX-6694 l
l File # 10110 l
903.8
-T E
Ref
- 10CFR50.55(e) l 1UELECTRIC Williarn G. Counsil frecutive %cr trewkat U. S. Nuclear Regulatory Commission ATIN:
Document Control Desk Washington, D.C. 20555 i
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NO. 50-445 LINER ATTACHMENT MATERIAL REQUIREMENTS: IMPACT TESTING SDAR: CP-87-22 (INTERIM REPORT)
Gentlemen:
1 On June 17, 1987, we verbally notified your Mr. Shannon Phillips of a deficiency wherein FSAR and specification requirements regarding impact testing of materials attached to the containment liner have not been implemented.
This is an interim i
report of a potentially reportable item under the provisions of 10CFR50.55(e).
Our latest interim report, logged TXX-6579, was submitted on July 17, 1987.
r Engineering is currently performing a fracture mechanics analysis to evaluate the ef fect of the non-impact tested material on the liner.
Upon completion of this analysis we will determine any safety significance and reportablity pursuant to 10CFR50.55(e).
We will provide our next report by October 26, 1987.
Very truly yours, A
@t W. G. Counsil fla.
v By:.
G. S. Keelev Manager,NuclearEl ing
~
BSD/amb c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)
' 8709040015 070831 PDR ADOCK 05000445 g6 L7 S
PDR 400 Nonh Olne Street LB BI Dallas, Texas 700I C
-