6 Log # TXX-6556
==
File # 10110 i
5 903.9
)
=
=
Ref # 10CFR50.55(e) 1UELECTRIC y
i William G. Counsil Executive Vice hesident U. S. Nuclear Regulatory Commission i
Attn: Document Control Desk Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 TRAIN "C" CONDUIT SUPPORTS SDAR:
CP-85-36 (INTERIM REPORT)
{
l Gentlemen:
On September 6,1986, we verbally notified your Mr. C. Gould of a deficiency i
involving the installation of non-safety related conduit (two-inch diameter q
I and smaller) on non-safety related dead weight supports in Category 1 areas.
4 This is an interim report of a potentially reportable item under the
{
provisions of 10CFR50.55(e).
Our latest interim report was logged TXX-6221, j
dated January 21, 1987.
As previously reported, the evaluation program developed to address this issue j
(CPRT Program Plan ISAP I.c) is still in process.
Currently, our field verification is continuing in the Unit 1 and Common Area to determine the adequacy of the Train C conduit supports.
To date, the I
evaluation of conduit supports in 180 rooms has been completed. These efforts I
represent approximately 63 percent of the rooms and 72 percent of the supports in the Unit 1 and Common Area.
Evaluation and verification activities for Unit 2 will be addressed after the completion of the Unit 1 and Common Area activities i
Our evaluation of the Unit 1 and Common Area is currently scheduled for completion by late December,1987.
We anticipate submitting our next report on this issue no later than February 10, 1988.
l Very truly yours, r
hbk3OOck$Ob445 W. G. Counsil S
PDR-7 By:
G. S. Keeley
& /
Manager,NuclearLicen/ing DAR/gj c - R. D. Martin, Region IV Resident Inspectors, CPSES (3)
}q
/