TXX-6524, Interim Deficiency Rept CP-85-53 Re Seismic Category I Platforms.Initially Reported on 851220.Platform Previously Misidentified as Category II Now Classified Category I. Rework Will Be Performed.Next Rept Anticipated by 871220

From kanterella
(Redirected from TXX-6524)
Jump to navigation Jump to search
Interim Deficiency Rept CP-85-53 Re Seismic Category I Platforms.Initially Reported on 851220.Platform Previously Misidentified as Category II Now Classified Category I. Rework Will Be Performed.Next Rept Anticipated by 871220
ML20215J753
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 06/19/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-85-53, TXX-6524, NUDOCS 8706250098
Download: ML20215J753 (1)


Text

,

i i j

M Log # TXX-6524 l l- -

File # 10110 '

3

. .:-- 903.8

= ----

Ref # 10CFR50.55(e)

TilELECTRIC 9

I Wimam G.'Counsil '

Executive Vice President U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555.

SUBJECT:

COMANCHE PEAK STEAM' ELECTRIC STATION (CPSES)

DOCKET N0. 50-445 SEISMIC CATEGORY I PLATFORMS

'SDAR: CP-85-53_(INTERIM REPORT)

Gentlemen:

1 On December 20, 1985, we verbally notified your Mr. R. Hall of a. deficiency ,

involving Seismic Category 11 platforms. This is an interim report of a i potentially reportable item under the provisions of 10CFR50.55(e). Our,last interim report, logged TXX-6408, was submitted. April'27, 1987.

Subsequent to.our last report, we have determined that the issue involves only Unit'1. A document search has indicated similar conditions do not exist in Unit 2. Additionally, we have determined that the original platform  ;

identified as a Category II platform has been misidentified and is, in fact,'a Category I platform. Thus, we have changed the title of this issue to correctly reflect the scope of the deficiency.

At this_ point, the affected platforms have been identified. The documentation for.these installations is under. review for completeness and acceptability by.

Quality-Engineering. Deficiency documents (NCRs/DRs) will be issued for those platforms which are determined to be discrepant. Rework or reinspections will be performed as appropriate after which our evaluation will be completed to determine the effect of this issue on the safety of plant operations had it remained uncorrected.

Our next report will be submitted no later than December 20, 1987.

Very truly yours, N

W. G. Counsil 1

JCH/dl  ;