TXX-6521, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 870918. Complete Evaluation Will Be Performed.Next Rept Will Be Submitted by 870915

From kanterella
(Redirected from TXX-6521)
Jump to navigation Jump to search
Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 870918. Complete Evaluation Will Be Performed.Next Rept Will Be Submitted by 870915
ML20215H832
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/19/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-85-39, TXX-6521, NUDOCS 8706240229
Download: ML20215H832 (2)


Text

,

M Log # TXX-6521 ll-- -:

File #~10110 903.10

=

Ref # 10CFR50.55(e) nlELECTRIC June 19, 1987 wimam c. counsa _

Executive Vice Preudent V. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 EQUIPMENT CONDUIT INTERFACE SDAR:

CP-85-39 (INTERIM REPORT)

Gentlemen:

On September 18, 1986, we verbally notified your Mr. T. F. Westerman of a i

. deficiency involving conduit which was not installed in accordance with design i

documents. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). Our most recent interim report was logged TXX-6438, dated May 12, 1987.

As previously reported, the program to evaluate this condition consists of the following three issues:

1)

Cable slack adequacy.

2)

Conduit-to-equipment interfaces outside the vendor approved area.

3)

Conduit orientation within the vendor approved entry area l

(Complete per interim report logged TXX-6165).

i The cable slack adequacy issue final report was issued as scheduled on May 14, 1987, and is presently undergoing third party review.

This review is I

scheduled for completion by June 19, 1987.

The issue date of the report on the Unit I conduit-to-equipment interface issue has been rescheduled from June 1, to June 19, 1987.

l After finalization of these reports, a complete evaluation will be performed to determine the effects of this issue on the safety of plant operations and j

i reportability under the provisions of 10CFR50.55(e).

%[2ggy h p-e n

/I Y

/

\\ O 400 North Olise Street LB 81 Dallas, Texas 720I

TXX-6521 J!!ne 19,1987 Page 2 of 2 We will submit our next report on this issue no later than September 15, 1987.

Very truly yours,

@/t W. G. Counsil RSB/dl c - R. D. Martin, Region IV Resident Inspectors, CPSES (3) l

- -_-