TXX-6521, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 870918. Complete Evaluation Will Be Performed.Next Rept Will Be Submitted by 870915
| ML20215H832 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/19/1987 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-85-39, TXX-6521, NUDOCS 8706240229 | |
| Download: ML20215H832 (2) | |
Text
,
M Log # TXX-6521 ll-- -:
File #~10110 903.10
=
Ref # 10CFR50.55(e) nlELECTRIC June 19, 1987 wimam c. counsa _
Executive Vice Preudent V. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 EQUIPMENT CONDUIT INTERFACE SDAR:
CP-85-39 (INTERIM REPORT)
Gentlemen:
On September 18, 1986, we verbally notified your Mr. T. F. Westerman of a i
. deficiency involving conduit which was not installed in accordance with design i
documents. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). Our most recent interim report was logged TXX-6438, dated May 12, 1987.
As previously reported, the program to evaluate this condition consists of the following three issues:
1)
Cable slack adequacy.
2)
Conduit-to-equipment interfaces outside the vendor approved area.
3)
Conduit orientation within the vendor approved entry area l
(Complete per interim report logged TXX-6165).
i The cable slack adequacy issue final report was issued as scheduled on May 14, 1987, and is presently undergoing third party review.
This review is I
scheduled for completion by June 19, 1987.
The issue date of the report on the Unit I conduit-to-equipment interface issue has been rescheduled from June 1, to June 19, 1987.
l After finalization of these reports, a complete evaluation will be performed to determine the effects of this issue on the safety of plant operations and j
i reportability under the provisions of 10CFR50.55(e).
%[2ggy h p-e n
/I Y
/
\\ O 400 North Olise Street LB 81 Dallas, Texas 720I
TXX-6521 J!!ne 19,1987 Page 2 of 2 We will submit our next report on this issue no later than September 15, 1987.
Very truly yours,
@/t W. G. Counsil RSB/dl c - R. D. Martin, Region IV Resident Inspectors, CPSES (3) l