TXX-6506, Interim Deficiency Rept CP-86-36 Re Scope of Plant Mods Resulting from Project Pipe Support Reverification Program. Initially Reported on 860609.Encl List Shows Support Mods Issued to Date.Next Rept Will Be Submitted on 870820
| ML20215C271 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/12/1987 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-86-36, TXX-6506, NUDOCS 8706180053 | |
| Download: ML20215C271 (2) | |
Text
y
.o Log.# TXX-6506 File # 10110 2M 903.9 L
d
'Ref. #_10CFR50.55(e)-
_r
=
filELECTRIC June 12, 1987.
. William G. Counsil.
Executive Vice President U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington,-DC '20555 i
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKETS NOS. 50-445 AND 50-446 LARGE BORE PIPING AND SUPPORTS
.SDAR: CP-86-36 (INTERIM REPORT)
Gentlemen:
On June' 9,1986, we verbally notified you of a reportable ' item involving the scope -
of plant modifications resulting from the project's pipe support reverification program (see TXX-4844). This is a follow-up interim report on a reportable item under provisions of 10CFR50.55(e). Our latest-interim report logged TXX-6358 was _
submitted on March 27, 1987.
The continuing engineering evaluation has not identified any additional instances which are considered reportable pursuant _to 10CFR50.55(e). The attached list shows the support modifications issued to date. The evaluation is continuing and we anticipate submitting our'next report by August 20, 1987.
l Very truly yours, M
W. G. Counsil BSD/amb Attachment c - Mr. R. D. Martin, Region IV W
Resident Inspectors, CPSES (3)'
k P
. q 6
i g
400 North Olive Street LB 81 Dallas, Texas 75201
1 Attachment to TXX-6506 June 12, 1987 Page 1 of 1 i
1 ATTACHMENT LARGE BORE PIPE SUPPORT MODIFICATIONS Number of-Unit Cateaory Modifications
- 1 Prudent 861 Recent Industry Practice 1346 Adjustment 990 Cumulative Effects 1558 1
2 Prudent.
1004 1
Recent Industry Practice 380 Adjustment 363 Cumulative Effects 622 l
Changes in these figures from the last report represent not only identification of further modifications but a recategorization of certain supports.
l i
q I
l