TXX-6502, Interim Deficiency Rept CP-86-13 Re Jet Impingement Load Review for High Energy Piping.Initially Reported on 860305. Schedule for Review Completion & Issuance of Final Engineering Report Changed to 870722.Next Rept by 870819

From kanterella
(Redirected from TXX-6502)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-13 Re Jet Impingement Load Review for High Energy Piping.Initially Reported on 860305. Schedule for Review Completion & Issuance of Final Engineering Report Changed to 870722.Next Rept by 870819
ML20215A663
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/12/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-13, TXX-6502, NUDOCS 8706170025
Download: ML20215A663 (1)


Text

_

k M

Log # TXX-6502 P """

File # 10110 903.11

=

=

Ref. # 10CFR50.55(e) 1UELECTRIC June 12, 1987 William G. Counsil a

Executhe Vice Preskknt i

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555

)

u l

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) 1 DOCKET NOS. 50-445 AND 50-446

{

JET IMPINGEMENT LOAD REVIEW j

SDAR: CP-86-13 (INTERIM REPORT)

Gentlemen On March 5,1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving a computer entry error which could invalidate portions of i

the jet impingement load review for high energy piping.

This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).

Our last interim report, logged TXX-6379, was submitted on April 3,1987.

The schedule for the completion of our review and the issuance of a final Engineering Evaluation Report has been revised to July 22, 1987.

Our next report will be submitted no later than August 19, 1987.

j l

i Very truly yours,

$$f W. G. Counsil BSD/gj c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 8706170025 870612 PDR ADDCK 05000445 q

S PDR 9

g h

D 400 North Olive Street LB 81 Dallas, Texas 75201