TXX-6423, Interim Deficiency Rept CP-86-04 Re Placement of Richmond Inserts in Proximity of Loaded Embedded Plates Which Could Compromise Integrity of Adjacent Shear Cones.Initially Reported on 870213.Next Rept Will Be Submitted by 870401

From kanterella
(Redirected from TXX-6423)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-04 Re Placement of Richmond Inserts in Proximity of Loaded Embedded Plates Which Could Compromise Integrity of Adjacent Shear Cones.Initially Reported on 870213.Next Rept Will Be Submitted by 870401
ML20215H712
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/01/1987
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-04, CP-86-4, TXX-6423, NUDOCS 8705070003
Download: ML20215H712 (1)


Text

_ _ - - _ _ _ .

.,mmm tog # TXX-6423 7] File # 10110 903.8 7UELECTR/C Ref # 10CFR50.55(e) wma c.counsa cmune n< onan, May 1, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 PR0XIMITY PLACEMENT - RICHMOND INSERTS TO EMBEDDED PLATES AND WELDED ATTACHMENTS TO EMBEDDED PLATES SDAR: CP-86-04 (INTERIM REPORT)

Gentlemen:

On February 13, 1987, we notified you by our letter logged TXX-6260, of a deficiency involving the placement of Richmond inserts in the proximity of loaded embedded plates which coula compromise the integrity of adjacent shear cones. This is an interim report of a deficiency which is reportable under the provisions of 10CFR50.55(e). By our telephone request of April 29, 1987, received'by your Mr. Cliff Hale, the due date for this report was extended until May 13, 1987.

Our corrective actions previously specified for Unit 1 are continuing as planned. Based on the current 3roject schedule, it is anticipated.that the Unit I corrective actions will 3e completed by December 31, 1987. New work for Unit 2 is being done in accordance with the revised design specification and the related construction / quality control procedures. The Unit 2 field verification of existing installations will be conducted following the completion of the Unit I verification.

We anticipate submitting our next report no later than August 1, 1987.

Very truly yours, W. G. Counsil 8705070003 870501 PDR S ADOCK 05000445 By: , .

PDR g, s, geeley c. /

Manager,NuclearLiegnsing BSD:amb c - Mr. E. H. Johnson, Region IV Mr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV d