TXX-6404, Interim Deficiency Rept CP-86-32 Re Thru Wall Embedded Conduit Sleeves.Nonconformance Repts Issued to Document Deficiencies Identified During Collection of as-built Data. Next Rept Will Be Issued by 871030

From kanterella
(Redirected from TXX-6404)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-32 Re Thru Wall Embedded Conduit Sleeves.Nonconformance Repts Issued to Document Deficiencies Identified During Collection of as-built Data. Next Rept Will Be Issued by 871030
ML20209C837
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/24/1987
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-32, TXX-6404, NUDOCS 8704290084
Download: ML20209C837 (1)


Text

__

M Log # TXX-6404 2M File # 10010 h

j 903.11

=

=

Ref: 10CFR50.55(e)

NELECTRIC April 24, 1987 mm

c. cm. u Emutne Vme Prrsaknt U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STA110N (CPSES)

DOCKET NOS. 50-445 AND 50-446 THRU WALL EMBEDDED CONDUIT SLEEVES SDAR: CP-86-32 (INTERIM REPORT)

Gentlemen:

On April 21, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving thru wall embedded conduit sleeves which have not been identified by number and may be overfilled. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).

Our latest interim report, logged TXX 6105, was submitted November 21, 1986.

Collection of the Unit I as built data, needed to complete the technical evaluation of this issue, is approximately 50 percent complete. To date, 27 nonconformance reports have been issued to document deficiencies relating to embedded conduit sleeves. These deficiencies were identified during collection of the as built data.

The collection of Unit I as-built data is currently scheduled for completion by May 22, 1987. The technical evaluation of this issue upon the safety of plant operations is currently scheduled for completion by September 25, 1987. Upon completion of the evaluation, as built data for Unit 2 will be obtained.

The schedules for Unit 2 will be provided in our next report.

We will submit our next report on this issue no later than October 30, 1987.

Very tr ly yours, ho W. G. Co nsil gfg427ggy Q[g y 45 U

'LS By:

~

/

G S. Keeley Manager, Nuclear Lice,nying RS8/mlh V

c - Mr. E.11. Johnson, Region IV Mr. D. L. Kelley, RI - Region IV Hr. H. S. Phillips, RI - Region IV 1