TXX-6234, Interim Deficiency Rept CP-86-12 Re Attachments at or Near Design Gaps Between Secondary Walls & Adjacent Walls/Floors. Initially Reported on 860227.Evaluation Continuing.Next Rept Expected by 870327
| ML20212J602 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/21/1987 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-12, TXX-6234, NUDOCS 8701280247 | |
| Download: ML20212J602 (1) | |
Text
,-
Log # TXX-6234 File # 10110 903.7 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. ese NORTH OtJVE STREET.1.3L SI. DALLAS, TEXAS 76301 January 21, 1987
,; a, a
lI I
wituAu. o. C.O.U.N.S.IL..
.e G
JAN 2 31987 JU,'
iU Mr. Eric H. Johnson, Director L '!
L- - -
Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission I
611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 COMMODITY INSTALLATIONS AT SECONDARY WALL DESIGN GAPS SDAR: CP-86-12 (INTERIM REPORT)
Dear Mr. Johnson:
On February 27, 1986, we verbally notified your Mr. T. Westerman of a deficiency involving attachments at, or in close proximity to, design gaps between secondary walls and adjacent walls / floors. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). Our last interim report was logged TXX-6108, dated November ?.1,1986.
We are continuing our evaluation and anticipate submitting our next report by March 27, 1987.
Very truly yours,
/[')%"
W. G. Counsil JCH/est c - NRC Region IV (0 + 1 copy)
Director, Inspection and Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 0701280247 870121 PDR ADOCK 05000445 S
PDR 1/0 4 rirvisrov or Tsx4s eTif.fTIES ELECTRIC OMfPDT SfFo q \\
WN
,