TXX-6139, Interim Deficiency Rept CP-86-78 Re Deviations in Structural Steel Bolting in Cable Spreading Room.Initially Reported on 861107.Pertinent Std Design Criteria Will Be Reviewed.Next Rept Will Be Submitted by 870311

From kanterella
(Redirected from TXX-6139)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-78 Re Deviations in Structural Steel Bolting in Cable Spreading Room.Initially Reported on 861107.Pertinent Std Design Criteria Will Be Reviewed.Next Rept Will Be Submitted by 870311
ML20211N751
Person / Time
Site: Comanche Peak  
Issue date: 12/05/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-78, TXX-6139, NUDOCS 8612180302
Download: ML20211N751 (2)


Text

... s Log # TXX-6139 File # 10110 903.9 TEXAS UTILITIES GENERATING COMPANY BEYWAY TOWER. 4SS NORTH OLIVE If7REET. LB. 88. DAt1AS TEXA8 flatt December 5, 1986

@@h.

b

= =f=n,

~

7 DEC-91986 !

Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects lj U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 1

Arlington, TX 76011

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 STRUCTURAL STEEL BOLTING CONNECTIONS WITH THREADS IN THE SHEAR PLANE IN THE UNIT 1 CABLE SPREADING ROOM SDAR: CP-86-78 (INTERIM REPORT)

Dear Mr. Johnson:

On November 7,1986, we verbally notified your Mr. Tom Westerman of deviations in the structural steel bolting in the cable spreading room. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).

Specifically, the applicable specification states that all field connections shall be made with high strength steel bolts in bearing type connections with threads excluded from shear planes except where otherwise stated er shown on engineering drawings.

Instances of bolted connections with threads in the shear plane which were not stated or shown on engineering drawings have been observed in the Unit 1 Cable Spreading Room.

In order to address this deviation, all pertinent standard design criteria will be reviewed to identify the components where such deviations may occur.

Structural design calculations for the Unit 1 Cable Spreading Room framing and typical design calculations for other identified components in both units will be evaluated to determine if such deviations are adverse to the safety of plant operations or impact the structural integrity of the frame or components.

If a field verification is necessary, typical shop fabrication drawings will be used to determine if the bolt length can be used as a criterion for determining if a bearing type connection has bolts with threads included in the shear plane. Additionally, we are reviewing the affected inspection procedures to assure they adequately address specification requirements for this attribute.

8612180302 861205 PDR ADOCK 0500044S g

PDR Qh

{ Ll O s unusms or 1rw sitanon ruwrnte cmsem

'~

TXX-6139 December 5, 1986 Page 2 of 2 We anticipate submitting our next report no later than March 11, 1987.

Very truly yours,

?

W. G. Counsil DAR/amb c - NRC Region IV (0 + 1 copy) i Director, Inspection & Enforcement (15 copies) 4

{.