TXX-6121, Interim Deficiency Rept CP-86-45 Re Interaction of Nonseismic Category I Structures & Components W/Seismic Category I Structures.Initially Reported on 860606. Evaluation to Be Completed by 870116.Next Rept by 870206
| ML20215D675 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/03/1986 |
| From: | Counsil W, Keeley G TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-45, TXX-6121, NUDOCS 8612160447 | |
| Download: ML20215D675 (1) | |
Text
Log # TXX-6121 File # 10110 903.7 TEXAS UTILITIES GENERATING COMPANY BEYWAY TOWER. 400 PNMITH OLIVE STRErr, L.B. 01 DAILA15. TEXAS 75335 December 3, 1986 1.'s^".ti?.0*h DEC - 91986 Mr. Eric H. Johnson, Director J
Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 1
611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 SEISMIC CATEGORY II SYSTEMS AND COMPONENTS SDAR: CP-86-45 (INTERIM REPORT)
Dear Mr. Johnson:
On June 6,1966, we verbally notified your Mr. T. F. Westerman of a possible deficiency involving the interaction of non-seismic Category I structures and components with seismic Category I structures. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).
We are presently evaluating this concern to identify if the present plant design is consistent with the FSAR and NUREG-1030. This evaluation is scheduled for completion by January 16, 1987.
We will submit our next report by February 6, 1987.
Very truly yours, h
04 b W. G. Counsil By:
G. S. Keeley Manager, Nuclear L1 Sing JDS/mlh c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 M2ggy $
S Q
QC\\C s u,nusrow or nx ss enunu or resnoc anuom
.