TXX-6105, Interim Deficiency Rept CP-86-32 Re Through Wall Embedded Conduit Sleeves.Initially Reported on 860421.Field Verification Procedure Issued to Obtain as-built Data. Next Response Anticipated by 870424

From kanterella
(Redirected from TXX-6105)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-32 Re Through Wall Embedded Conduit Sleeves.Initially Reported on 860421.Field Verification Procedure Issued to Obtain as-built Data. Next Response Anticipated by 870424
ML20214J204
Person / Time
Site: Comanche Peak  
Issue date: 11/21/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-32, TXX-6105, NUDOCS 8612010201
Download: ML20214J204 (1)


Text

_

7 Log # TXX-6105 File # 10110 903.11 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER = ese PdORTH OLIVE STREET. LB. et. DALLAS, TEXAS 7830B November 21, 1986

'a^".SB :a 3 @ M 0Wll +

NOV 2 41986 Mr. Eric H. Johnson, Director p

Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NO. 50-445 AND 50-446 THRU WALL EMBEDDED CONDUIT SLEEVES SDAR: CP-86-32 (INTERIM REPORT)

Dear Mr. Johnson:

On April 21, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving thru wall embedded conduit sleeves which have not been identified by number and may be overfilled.

This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). We have submitted interim reports logged TXX-4790, TXX-4935, and TXX-5030, dated May 9, 1986, July 24, 1986, and September 19, 1986, respectively.

A field verification procedure (TNE-FVM-EE-023) has been issued to obtain as-built data whereby a technical evaluation of the significance of these conditions can be assessed. The schedule for completing the field verification is April 1, 1987.

The schedule for completing the technical evaluation will be determined at a later time.

We anticipate submitting our next response by April 24, 1987.

Very truly yours, fadus W. G. Counsil RSB/amb c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission

~ Washington, D. C.

20555

'I D 8612010201 861121 PDR ADOCK 05000445 S

PDR _

g Z}

g_.1345 4 ~ ~- -===>= > >- >c aa < -