Interim Deficiency Rept CP-86-64 Re Degradation of Protective Coatings for Unit 2 Diesel Fuel Oil Tanks. Initially Reported on 860904.Assessment of Tank Coating Underway.Next Rept Expected by 870205
ML20215F184
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/03/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-64, TXX-6013, NUDOCS 8610160113
Download: ML20215F184 (1)


Text

E log # TXX-6013 File # 10110 909.5 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OI.JVE FI"REET. L.B. 31. DALLAS. TEXA8 7520 8 October 3, 1986 WILLIAM G. COUNSIL b

Mr. Eric H. Johnson Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission M. -[ g 611 Ryan Plaza Drive, Suite 1000 i

__ j Arlington, Texas 76012 U

i

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 C0ATINGS FOR UNIT 2 DIESEL FUEL OIL TANKS SDAR:

CP-86-64 (INTERIM REPORT)

Dear Mr. Johnson:

On September 4,1986, we verbally notified your Mr. I. Barnes of a deficiency involving the protective coatings for the Unit 2 diesel fuel oil storage tanks. Specifically, declassification of the coatings specification in 1985 has resulted in unresolved issues involving the repair process for the internal coatings of the safety-related tanks. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).

Our evaluation of this deficiency includes two activities: an assessment of the cumulative effects and consequences of a tank coating degradation, and a determination of the required rework or repair. The assessment will consider coating degradation and its affect on potential blockage of the suction strainers to the fuel oil transfer pumps.

The results of this assessment will provide the basis for rework or repair for Unit 2.

Upon completion, fuel will be transferred to the Unit 2 installation to allow inspection of the Unit 1 fuel storage tanks.

Results of our evaluation are scheduled for completion January 16, 1987. We anticipate submitting our next report February 5, 1987.

Very truly yours, W. G. Counsil JCH/amb c - Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D. C.

20555 8610160113 861003 0