Text
-_
Log # TXX-5051 File # 10110 903.8 TEXAS UTILITIES GENERATING COMPANY MKYWAY TOWER
- 400 NORTH OLIVE STREET. LB. 81. DALLAS. TEXAS 75201 September 29, 1986 t'MMMfE"O Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects V. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NO. 50-445 DRILLING / CUTTING 0F REINFORCING STEEL IN THE FUEL HANDLING BUILDING SDAR: CP-86-50 (INTERIM REPORT)
Dear Mr. Johnson:
On August 29, 1986, we verbally notified your Mr. T. Westerman of a deficiency involving the drilling / cutting of reinforcing steel in the fuel handling building. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).
Specifically, cutting activities have been noted in the fuel handling building which extend possibly to the third layer of reinforcing steel in cases where only cutting the first layer of reinforcing steel was authorized or evaluated.
We are continuing our evaluation and anticipate submitting our next report by November 1, 1986.
Very truly yours, Y
W. G. Counsil JCH/amb c - NRC Region IV (0 + 1 copy)
Director, Inspection and Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 8610100326 860929 PDR ADOCK 05000445 S
, Zl
\\
A omswu or rexas vrstmes eucrmc wurAur t %
>