- _ _ _ _ _ _ _ _ _ _
Log # TXX-5032 File # 10110 903.9 TEXAS UTILITIES GENERATING COMPANY NKYW AY TOWER. 400 NORTH OIJVE STELET. L.H. 81. DALLAS. TEXAS 75301 l
September 19, 1986 E E A 'Y"'U "
M@M0WK %
SEP 2 51935 i
i Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 ANCHOR BOLTS SUPPLIED BY HILTI SDAR: CP-86-51 (INTERIM REPORT)
Dear Mr. Johnson:
On July 17, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving a condition cited at another nuclear facility in which anchor bolts supplied by Hilti do not meet average ultimate tensile loads in certain sizes as published by the supplier. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4969, dated August 18, 1986.
We are continuing cur evaluation and anticipate submitting our next report by November 14, 1986.
Very truly yours,
//Y 0%
W. G. Cou s'l j
By: d.
M G. S. Keele Manager, Licens n JCH/amb c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8610060404 860718 PDR ADOCK 05000445 '
S Pnn
(
A suvssioN or Texas urts.rrses es.scrasc cossrANY
-