TXX-5007, Interim Deficiency Rept CP-86-12 Re Commodity Installation at Secondary Wall Design Gaps.Initially Reported on 860227. Engineering Contractors Evaluating Generic Displacement Values.Next Rept Will Be Submitted by 861124

From kanterella
(Redirected from TXX-5007)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-12 Re Commodity Installation at Secondary Wall Design Gaps.Initially Reported on 860227. Engineering Contractors Evaluating Generic Displacement Values.Next Rept Will Be Submitted by 861124
ML20203N001
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/12/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-12, TXX-5007, NUDOCS 8609230021
Download: ML20203N001 (2)


Text

s

[ Log # TXX-5007 file # 10110

'=

903.7 TEXAS UTILITIES GENERATING COMPANY September 12, 1986 JIM 71*Sf.7At Mr. Eric H. Johnson, Director R)g@@M[

1 I!i h Division of Reactor Safety and Projects } SEP l ?. 986 H' U. S. Nuclear Regulatory Commission ,

611 Ryan Plaza Drive, Suite 1000 '

D Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC' STATION DOCKET NCS. 50-445 AND 50-446 COMM0DITY INSTALLATION AT SECONDARY WALL DESIGN GAPS SDAR: ,CP-86-12 (INTERIM REPORT)

Dear Mr. Johnson:

1 s

On February 27, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving attachments at, or in close proximity to, design gaps between secondary walls and adjacent walls / floors. This is an interim report of a potentially reportable item undt.r the provision of 10CFR50.55(e). Our last interim report was logged TXX'4923, dated July 21, 1986.

Evaluation of this issue involves th)ee activities. Initially, the engineering' contractors charged with design responsibility for the various installed commodities (i.e. conduits, HVAC, cable tray hangers) will evaluate incorporation of a generic displacement for horizontal and vertical movements.

These displacement values will be further refined by Gibbs & Hill for installations for which the generic value is determined not acceptable. The final activity involved in the evaluhtion of this deficiency will consist of field verifi' cation' to identify potentially unacceptable interactions between s

installations.

  • The results of these efforts will provide the information required to assess y the significance of this issue. All efforts are currently underway except the i field verifications scheduled to begin in mid-October 1986. We anticipate

, submitting our next report by November 24, 1986.

mIE N 'Very truly yours ,

oO CD O -

.hOS W g W. G. Counsil o$

JCH/amb

_. L a ourisuos or rexas vruurres etecrurc coursur ,

.d f' t c - NRC Regicn IV (0 + 1 copy) ,

Director, Inspection & Enforcement (15 copies)

U.S. Nuclear Regulatory Comission Washington, D.C. 20555 f