TXX-4981, Interim Deficiency Rept CP-86-52 Re Splices/Connections for Cable Trays.Initially Reported on 860725.Evaluation Continuing by Ebasco.Next Rept Will Be Submitted by 861021

From kanterella
(Redirected from TXX-4981)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-52 Re Splices/Connections for Cable Trays.Initially Reported on 860725.Evaluation Continuing by Ebasco.Next Rept Will Be Submitted by 861021
ML20212P602
Person / Time
Site: Comanche Peak  
Issue date: 08/22/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-52, TXX-4981, NUDOCS 8609030205
Download: ML20212P602 (1)


Text

Log # TXX-4981 File # 10110 903.11 TEXAS UTILITIES GENERATING COMPANY BKYWAY TOWER. 400 NORTH OtJVE frTREET. L.B. 51 o DALI.AS. TEXAM 78201 August 22, 1986 In%UJMf.7.*A E ;.

S-

'\\

)

2 7 E ;bi t

Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 CABLE TRAY SPLICES / CONNECTIONS SDAR: CP-86-52 (INTERIM REPORT)

Dear Mr. Johnson:

On July 25, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving the splices / connections used for cable trays. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).

Splices / connections used for certain cable tray types and sizes have been observed which do not conform to the acceptable splice patterns defined by the cable tray manufacturer or approved field design change documents.

Additionally, the applicable QC inspection documents for Tray Types A and B did not require verification of splice / connector configurations and dimensions.

The evaluation and the identification of corrective actions (if required) for these conditions are currently being undertaken by Ebasco. We are continuing our evaluation and anticipate submitting our next report by October 21, 1986.

Very t M y yours, W4M W. G. Counsil

$bOS$$4s By:

PDR G.S. Keeley Manager, Nuclear icensing JCH/amb c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 I 0 A DIVISION OF TRKAS EJTitJTEES CLECTRIC COMPANY

% %7

%t L7