Interim Deficiency Rept CP-86-50 Re Nut Alignment & Torque Requirements for Unistrut Spring Nuts on Instrument Mounts. Initially Reported on 860716.Evaluation of safety-related Instruments Planned.Next Rept Will Be Submitted by 861010
ML20212M946
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/18/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-50, TXX-4968, NUDOCS 8608280016
Download: ML20212M946 (2)


Text

. - -

Log # TXX-4968 File # 10110 903.10 TEXAS UTILITIES GENERATING COMPANY

.uv..vro.

mmrn.

agr. g. o m

.1 x.. n..

WILLIAM G. COUNSIL

'" ""~E8.'"Eric H..lohnson, Director Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 UNISTRUT SPRING NUTS ON INSTRUMENT SUPPORTS SDAR: 'CP-86-50 (INTERIll REPORT)

Dear Mr. Johnson:

On July 16, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving nut alignment and torque requirements for unistrut spring nuts on instrument mounts. This is an interim report of a pctentially reportable item under the provisions of 10CFR50.55(e). On August 15, 1986, we requested and received an extension until August 18, 1984, in submitting this report from your Mr. D. Hunnicutt.

A evaluation of all Unit I safety related instruments presently installed is planned.

This review will include damage and deficiency ic'entification, torquing and alignment of spring nuts, and inspection / verification by QC.

Prior to the initiation of this rework, the applicable construction procedures, and QC inspection procedures, specification, will be revised to incorporate the vendor's torquing requirements and establish inspection attributes. Upon revision of these documents, individual operational travelers for each safety related instrument will be generated to control the evaluation i

f We are continuing our evaluation of this issue. We anticipate submitting our next report no later than October 10, 1986.

i Very truly yours, Yu1A W. G. Counsil By:

G. S. Keele Manager, Nu ear icensing JCH/arh 8608280016 860818 PDR ADOCK 05000445 S

PDR 3[Z}

A omsson or rexAs viitsizes esecrusc courAur o

--3, c - Ni:C Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 T