TXX-4805, Interim Deficiency Rept CP-85-34 Re Adequacy of Conduit Supports to Perform Intended Design Functions.Initially Reported on 850906.All Electrical Raceway Items Consolidated.Next Rept by 861021

From kanterella
(Redirected from TXX-4805)
Jump to navigation Jump to search
Interim Deficiency Rept CP-85-34 Re Adequacy of Conduit Supports to Perform Intended Design Functions.Initially Reported on 850906.All Electrical Raceway Items Consolidated.Next Rept by 861021
ML20198E450
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/16/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-85-34, TXX-4805, NUDOCS 8605280012
Download: ML20198E450 (1)


Text

Log # TXX-4805 File # 10110 903.9 l

TEXAS UTILITIES GENERATING COMPeBT AKYWAY TOWER . 400 NORTil OtJVE NTREET. L.35. Al . DAELAN. TEX AN 78908 May 16, 1986

.2?L'eNY%'h Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 CONDUIT SUPPORT DESIGN SDAR: CP-85-34 (INTERIM REPORT)

Dear Mr. Johnson:

On September 6,1985, we verbally notified your Mr. C. Gould of a deficiency regarding the adequacy of conduit supports to perform their intended design functions. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). We have submitted interim reports logged TXX-4571 and TXX-4681, dated September 30, 1985, and January 31, 1986, respec-tively.

This issue is related to CP-85-19, Conduit Support Spans. Both issues are being evaluated under CPRT Program Plan Item VIII, which is currently scheduled for completion in September,1986. Since the last status report all electrical raceway items (trays, conduits, supports) have been consolidated under the scope of Ebasco Services.

We are continuing our evaluation and anticipate submitting our next report by October 21, 1986.

Very truly yours, V720 W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 Copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C. 20555 g528co12860516 s ADocK 05000445 PDR s[y A DIVISION OF TEXA8 UTE12 TIES ELECTRIC CUMPANY

_ _ . . . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ - _ - _ _ -